You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Developmentally Appropriate Technology for Science Assessment in Early Elementary Grades

    SBC: 3-C Institute for Social Development, Inc.            Topic: 99190018R0006

    In this project, researchers will develop a prototype of Science Quest, a tool to assess the science skills and understanding for students in grades 1 to 3. The prototype will deliver psychometrically validated assessment items in a game-like format. Educators will be able to assign and monitor completion of science assessments, view assessment results in real-time with reports at the individual a ...

    SBIR Phase I 2018 Department of EducationInstitute of Education Sciences
  2. A Comprehensive Tool for Supporting Social and Emotional Learning Instruction for Students with High-Functioning Autism Spectrum Disorder

    SBC: 3-C Institute for Social Development, Inc.            Topic: 1

    The key components of the IvyScip platform will include a user interface for teachers to complete an assessment battery on individual students diagnosed with HF-ASD, a backend system for storing data, data-driven recommendations for supporting student needs, and reports on student progress over time. The platform will also include an online teacher implementation guide.

    SBIR Phase II 2016 Department of Education
  3. StepWise Virtual Tutor for Algebra I

    SBC: QUERIUM CORP            Topic: 1

    StepWise will be a mobile and desktop virtual tutor that provides real-time assessments and support to middle and high school students to learn Algebra. The adaptive engine will include rule-based artificial intelligence to guide students through the steps of solving problems, and will permit students to explore many different pathways to a correct response. After entering a response, students wil ...

    SBIR Phase II 2016 Department of Education
  4. Conundrum: A Project to Computerize the Comprehensive

    SBC: The Evans Associates            Topic: N/A

    CSMP is an exciting K-6 math program, designated as an "exemplary educational program that works¿ by the U.S. Department of Education, which funded its development, evaluation, and dissemination. Its spiral, problem solving approach uses picture languages, abaci, and technically challenging games. Simple problems subtly introduce sophisticated concepts. While class and teacher-student intera ...

    SBIR Phase I 1997 Department of Education
  5. AN AUDIO-VISUAL STIMULATION UNIT WITH EEG BIOFEEDBACK FOR ENHANCING COGNITIVE ABILITIES OF LEARNING DISABED BOYS

    SBC: Bio-educational Research Inc.            Topic: N/A

    THIS PROJECT WILL DEVELOP AN INEXPENSIVE, PORTABLE, ELECTROENCEPHALOGRAPH (EEG) BIOFEEDBACK UNIT THAT PROVIDES AUDIO AND VISUAL STIMULATION (AVS) AT BRAINWAVE FREQUENCIES TO AID IN THE TREATMENT OF LEARNING DISABLED (LD) SCHOOL CHILDREN WITH ATTENTION DEFICIT DISORDER (ADD) OR WITH ATTENTION DEFICIT HYPERACTIVITY DISORDER (ADHD). THE UNIT WILL BE EASY ENOUGH TO OPERATE, SO THAT COUNSELORS AT SCHOO ...

    SBIR Phase II 1994 Department of Education
  6. WE PROPOSE TO DEVELOP A PORTABLE COMPUTER BASED COMPLIANCE ENHANCEMENT AND DECISION MAKING SYSTEM (DIACARE PROGRAM) FORUSE IN THE TREATMENT OF INSULIN DEPENDENT DIABETES. THE DIACARE PROGRAM WILL BE DESIGNED TO OPERATE ON A HAND HELD COMPUTER WHICH CAN BE

    SBC: Triangle Research and Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Education
  7. DESIGN AND REMOVAL OF ARCHITECTURAL BARRIERS

    SBC: Barrier Free Environments Inc            Topic: N/A

    THIS PROPOSAL ADDRESSES THE DEVELOPMENT OF A MODEL PLAN FOR ANALYZING ARCHITECTURAL BARRIERS AS WELL AS RECOMMENDING GENERALIZED METHODS FOR OVERCOMING SUCH BARRIERS IN PUBLIC AND PRIVATE BUILDINGS. IT INCLUDES THE RESEARCH AND DEVELOPMENT OF A COMPUTER DATA SOFTWARE SYSTEM WHICH WILL ORGANIZE AND STORE THE LARGE AMOUNT OF INFORMATION NEEDED INTO A MANAGEABLE RETRIEVAL SYSTEM THAT WILL GUIDE THE U ...

    SBIR Phase I 1983 Department of Education
  8. N/A

    SBC: STARFIRE ENGINEERING INC.            Topic: N/A

    WHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...

    SBIR Phase I 1983 Department of the Interior
  9. N/A

    SBC: TRADCO CHEMICAL CORPON            Topic: N/A

    USING RADIO TELEMETRY MODEMS, IS CURRENTLY POSSIBLE. THIS IS NECESSARY BECAUSE LACK OF MONITORING CAUSES INADEQUATE CONTROL OF INTERNAL CORROSION TAKING PLACE INSIDE OFFSHORE PIPELINE SYSTEMS. THE NET RESULT IS PIPELINE FAILURE DUE TOTHE EFFECTS OF CORROSION. THE RESULT OF PIPELINE FAILURE WILL BE AN OIL SPILL IN COASTAL WATERS. AS THE NATION'S OFFSHORE PIPELINE SYSTEM GROWS OLDER, THE NET EFFECTS ...

    SBIR Phase I 1983 Department of the Interior
US Flag An Official Website of the United States Government