You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SEISMIC PRA
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL
SBC: Levy S Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES
SBC: N.h. Parker, P.e. And Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission