You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SBIR Phase I: Neural Network Methods for Robust System Identification

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  2. SBIR PHASE I: Holographic Grating Filters for CaII Line Imaging and Emission Spectroscopy

    SBC: Accuwave Corp.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  3. SBIR Phase I: Wide Bandwidth Optical Network Monitor

    SBC: Accuwave Corp.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  4. SBIR PHASE I: Asynchronous Integration of Processors and Hardware for Real-Time Simulation

    SBC: Ad Inter            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  5. SBIR Phase I: Improved Accuracy for Student/Scientist Networks

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  6. SBIR PHASE I: Novel Bridgman Growth of Tungsten Bronze Crystals for Emerging Nonlinear Optical Applications

    SBC: 3D TECHNOLOGY LABORATORIES            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  7. SBIR Phase I: A Study of System Architectures for a Solid- State 3D Display Based on Two-Photon Upconversion

    SBC: 3D TECHNOLOGY LABORATORIES            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  8. SBIR Phase I: Enchanced Holographic Data Storage in Ferroelectric Photorefractive Media

    SBC: 3D TECHNOLOGY LABORATORIES            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  9. SBIR PHASE I: A Compact Betatron for Nondestructive Evaluation

    SBC: ADELPHI TECHNOLOGY INC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  10. LOW-COST COMPOSITE MANUFACTURING PROCESS

    SBC: Adherent Technologies, Inc.            Topic: N/A

    THE ADVANTAGES OF THERMOPLASTIC MATRIX COMPOSITES FOR MANUFACTURING LOW-COST CMPONENTS HAVE YET TO BE REALIZED. AN IMPORTANT FACTOR LIMITING THERMOPLASTIC COMPOSITES IS THE LACK OF LOW-COST METHOD FOR PRODUCING HIGH-QUALITY PREPREGS AND PREFORMS. A METHOD OF PRODUCING THESE MATERIALS THAT IS COMPATIBLE WITH COMMONLY USED COMPOSITE FABRICATION TECHNIQUES SUCH AS FILAMENT WINDING, PULTRUSION, AND PR ...

    SBIR Phase II 1996 National Science Foundation
US Flag An Official Website of the United States Government