You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF SURFACE ACOUSTIC WAVE (SAW) ALTITUDE SENSOR
SBC: Amerasia Technology, Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of Transportation -
ENGINE-POWERED HIGH TEMPERATURE HEAR PUMP GRAIN DRYER.
SBC: Beard Industries, Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of Agriculture -
THE RESEARCH WILL ESTABLISH THE IMPORTANT DESIGN PARAMETERS FOR PRODUCING AN OPERABLE, WALL-MOUNTED, DIRECT-BEAM, DAYLIGHTING DEVICE OF THE TYPE DESCRIBED. THE ARCHITECTURALAND ECONOMIC BENEFITS WILL BE ASSESSED FOR BOTH NEW AND RETROFIT CONSTRUCTION. THE
SBC: Biometallics Inc Topic: N/AN/A
SBIR Phase I 1983 Department of Agriculture -
FABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS.
SBC: The Cumagna Corpon Topic: N/AFABRICATING STRUCTURAL ELEMENTS, SUCH AS I-BEAMS, FROM FIBERREINFORCED COMPOSITE MATERIALS. THESE ELEMENTS ARE EXPECTEDTO BE EXTREMELY STRONG, ONE-FOURTH THE DENSITY OF STEEL, ANDTO PERMIT CONSIDERABLE SAVINGS IN THE COST OF ERECTION, MAINTENANCE, AND REPLACEMENT OF BRIDGES, ETC. PHASE I WILL PRODUCE, TEST, AND ANALYZE I-BEAMS FABRICATED FROM SEVERAL MAGNAWEAVE CONSTRUCTIONS (WEAVE GEOMETRIES); TH ...
SBIR Phase I 1983 Department of Transportation -
THERE IS A GREAT NEED FOR ECONOMIC DEVELOPMENT ON INDIAN RESERVATIONS IN THE US.
SBC: Dean Chavers Associates, Inc. Topic: N/ATHERE IS A GREAT NEED FOR ECONOMIC DEVELOPMENT ON INDIAN RESERVATIONS IN THE US. THE UNEMPLOYMENT RATE ON TRIBAL LANDS IS HIGH AND THERE IS MINIMAL ECONOMIC DEVELOPMENT. IN SPITE OF THE OBSSTACLES OF ISOLATION, LACK OF CAPITAL FORM- ATION AND LACK OF TRAINED PERSONNEL, SOME ENTERPRISES HAVE SUCCEEDED AND ARE PROFITABLE. THIS RESEARCH PROJECT WILL INVESTIGATE WHAT ENABLED THESE PROJECTS TO SUCCEED ...
SBIR Phase I 1983 Department of Agriculture -
RADAR TRAFFIC MONITOR FOR INTERSECTION TRAFFIC MANAGEMENT
SBC: Epsilon Lambda Electronics Corp. Topic: N/AN/A
SBIR Phase I 1983 Department of Transportation -
ACROSS THE RURAL SOUTH.
SBC: Forest Care Company Topic: N/AMILLIONS OF ACRES OF UNMANAGED PRIVATE NON-INDUSTRIAL FORESTLAND ACROSS THE RURAL SOUTH PRESENT AN EXTRAORDINARY OPPOR- TUNITY TO CREATE NEW BUSINESSES AND JOBS. MOST PRESENT FORESTRY CONTRACTORS WHO PROVIDE SERVICES SUCH AS TIMBER HARVESTING AND SITE PREPARATION OPERATE WITH EQUIPMENT TOO LARGE AND INEFFICIENT FOR LANDOWNERS. TO ASSIST LANDOWNERS IN BEGINNING INTENSIVE MANAGEMENT, ADDITIONAL NEW ...
SBIR Phase I 1983 Department of Agriculture -
SEISMIC PRA
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
MONOCLONAL ANTIBODIES AND MUNOLOGIC FOR T-2 TOXIN
SBC: Genetic Diagnostics Corp Topic: N/AN/A
SBIR Phase I 1983 Department of Agriculture -
FIELD GRAFTING COLD CLIMATE VINEYARDS.
SBC: Hunt Farms Topic: N/AN/A
SBIR Phase I 1983 Department of Agriculture