You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPOSITE MATERIAL DESIGNS FOR ASROC LAUNCHER MK112

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  2. WEIGHT, COMPACT SOLAR WATER DISTILLATION PURIFICATION DEVICE

    SBC: Abel Company            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  3. N/A

    SBC: ABIOMED, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  4. EMISSION STRATEGIES AND OPERATIONS IN MODERN NAVAL COMBAT SYSTEMS

    SBC: Adler Consultants, Inc.            Topic: N/A

    Not Available

    SBIR Phase I 1983 Department of DefenseNavy
  5. TECHNOLOGY FOR SPACERCRAFT

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    WE WILL PERFORM RESEARCH INTO AN OPTICAL MEMORY DEVICE TECHNOLOGY WHICH SHOWS THE POTENTIAL A OF PROVIDING A REPLACEMENT FOR MECHANICALMAGNETIC TAPE RECORDERS CURRENTLY USED IN SPACECRAFT, BUT WITH SIGNIFICANTLY HIGHER RELIABILITY. THE TECHNOLOGY IS BASED ON THE PHOTON ECHO PHEOMENON, AND PROVIDES STOAGE CAPACITY INCEASES (UP 10 (15) BITS) AS WELL AS THE REQUIRED CONTINUOUS OPERATION OF SEVEN YEAR ...

    SBIR Phase I 1983 Department of DefenseAir Force
  6. TRACKING PROGRESSIVE FRACTURE\TOWARDS RETIREMENT FOR CAUSE

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  7. CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA.

    SBC: Advanced Applied Technology            Topic: N/A

    CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA. A VIDEO DISPLAY WITH BORESIGHTED CROSSHAIR IS USED FOR OPERATOR DISPLAY. THIS PROPOSAL IS TO PROVIDE A REAL TIME READOUT OF CALIBRATED BACKGROUND OR TARGET CROSS SECTION ON THE VIDEO DISPLAY TO ENABLE BETTER USE OF FLIGHT TIME. THE READOUT WOULD ALSO BE ...

    SBIR Phase I 1983 Department of DefenseArmy
  8. THIS PROGRAM ADDRESSES THE KEY PROBLEM IN THE DEVELOPMENT OF LIGHTWEIGHT COMPOSITE WAVEGUIDES, NAMELY THE SELECTION OF SUITABLE PROCESS\MATERIAL TO PROVIDE IF THE NECESSARY INTERIOR CONDUCTIVE COATING.

    SBC: Advanced Composite Products            Topic: N/A

    THIS PROGRAM ADDRESSES THE KEY PROBLEM IN THE DEVELOPMENT OF LIGHTWEIGHT COMPOSITE WAVEGUIDES, NAMELY THE SELECTION OF SUITABLE PROCESS\MATERIAL TO PROVIDE IF THE NECESSARY INTERIOR CONDUCTIVE COATING. A SURVEY OF THE WIDE VARIETY OF ABALABLE MEHTODS IS PERFORMED WITH THE SPECIFIC REQUIREMENTS OF WAVEGUIDES IN MIND. TWO CONDUCTIVE COATING METHODS ARE THEN

    SBIR Phase I 1983 Department of DefenseAir Force
  9. THE OBJECTIVE IS TO ASSESS THE FEASIBILITY OF INTEGRATING DECISION ANALYSIS, ARTIFICIAL INTELLIGENCE AND OPERATIONS RESEARCH PLANNING AIDS INTO AN INTEGRATED SET OF AIDS FOR PERFORMING FUNCTIONS IN OCA MISSION PLANNING, FROM THE TARGET NOMINATION LEVEL

    SBC: Advanced Decision Systems            Topic: N/A

    THE OBJECTIVE IS TO ASSESS THE FEASIBILITY OF INTEGRATING DECISION ANALYSIS, ARTIFICIAL INTELLIGENCE AND OPERATIONS RESEARCH PLANNING AIDS INTO AN INTEGRATED SET OF AIDS FOR PERFORMING FUNCTIONS IN OCA MISSION PLANNING, FROM THE TARGET NOMINATION LEVEL DOWN THORUGH THE SPECIFIC ROUTE PLANNING LEVEL. PHASE I EFFORT WILL EMPHASIZE TECHNOLOGY ISSUES RATHER THAN ENGINEERING DESIGN AND BUILD ISSUES. TH ...

    SBIR Phase I 1983 Department of DefenseAir Force
  10. KNOWLEDGE BASED INTELLIGENCE DATA ANALYSIS

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
US Flag An Official Website of the United States Government