You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. ACCEPTANCE TEST CONCEPTS FOR MECHANICAL SYSTEMS

    SBC: Architectural Energy Corporati            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED PROJECT IS TO DEVELOP A COMPREHENSIVE ACCEPTANCE TEST PROCEDURE THAT DETERMINES WHETHER AIR DISTRIBUTION SYSTEMS IN NEW BUILDINGS ARE INSTALLED PROPERLY AND OPERATING IN AN ENERGY EFFICIENT MANNER. THE APPROCH IS TO MEASURE CRITICAL ENERGY, FLOW, PRESSURE AND TEMPERATURE PARAMETERS AND TO COMPARE THESE RESULTS WITH EXPECTED VALUES FROM DESIGN CALCULATIONS AND ENGINEER ...

    SBIR Phase II 1989 Department of DefenseArmy
  2. ACCESS: A COMMUNICATING AND COOPERATING EXPERT SYSTEMS SYSTEM

    SBC: SYMBIOTECH, INC.            Topic: N/A

    THE INTENT OF THIS PROJECT IS TO PROVIDE A SOFTWARE ENVIRONMENT WHICH WILL ALLOW IMMEDIATE IMPLEMENTATION OF A VARIETY OF COOPERATING EXPERT SYSTEM PARADIGMS. THE ENVIRONMENT, REFERRED TO AS ACCESS, WILL BE DESIGNED TO BE EXPERT SYSTEM REPRESENTATION INDEPENDENT, BE PORTABLE TO ANY HARDWARE WHICH SUPPORTS COMMON LISP, PROVIDE A FLEXIBLE MESSAGE PASSING PROTOCOL AND ALLOW THE USER TO ARRANGE EXPERT ...

    SBIR Phase II 1989 Department of DefenseArmy
  3. A COMPACT ROBOTIC COMMAND CENTER PHASE II: IMPLEMENTING A HARDENED COMPACT UNIT

    SBC: Cybernet Systems Corporation            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  4. ACTIVITIES

    SBC: General Systems Group            Topic: N/A

    GSG HAS OBSERVED LIMITED SUPPORT OF MODERN PROGRAMMING PRACTICE BY DOD SOFTWARE CONTRACTORS DUE TO THE RISKS INVOLVED AND THE ABSENCE OF PAY-OFF DATA. CONTRACTORS ALSO HAVE A DIFFICULT TIME ACCRATELY ESTIMATING AND SCHEDULING QUALITY RELATED ACTIVITIES ON SOFTWARE OF QUALITY RELATED ACTIVITIES IN ORDER TO PROVIDE THE MODELS WHICH CAN BE USED TO (A) DETERMINE THE VALUE OF SUCH ACTIVITIES TO CONTRAC ...

    SBIR Phase I 1983 Department of DefenseArmy
  5. ADAPTIVE CANCELLATION OF ENGINE NOISE

    SBC: Signatron Acquisition Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  6. ADAPTIVE CONTROL NONLINEAR MULTI-AXIS VIBRATION

    SBC: Synergistic Technologies, Inc.            Topic: N/A

    MULTIAXIS VIBRATION TESTING CONTRIBUTES SUBSTANTIALLY TO ENVIRONMENTTEST ECONOMICS AND IMPROVED PRODUCTS. THE EFFECTIVENESS OF STATE-OFTHE-ART MULTI-EXCITER CONTROL SYSTEMS IS LIMITED BY CERTAIN UNAVOIDABLE NONIDEAL DYNAMIC-RESPONSE BEHAVIORS. IT IS PROPOSED THAT THESE TROUBLESOME PHENOMENA BE IDENTIFIED AND QUANTIFIED. IT IS ALSO PROPOSED TO STUDY EXTENSION IF CONTROL CAPABILITIES BY INNOVATIVE R ...

    SBIR Phase II 1989 Department of DefenseArmy
  7. ADAPTIVE RESOURCE ALLOCATION FOR ADVACED ELINT\ESM SYSTEMS

    SBC: Greenbriar Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  8. A DEMONSTRATION OF THE FEASABILITY OF A LASER-ASSISTED CHEMICAL VAPOR DEPOSITION PROCESS FOR MERCURY CADIUM TELLURIDE FILMS UTILIZING LARGE AREA, UNIFORM RARE-GAS HALIDE EXCIMER LASER ILLUMINATION IS PROPOSED.

    SBC: Aracor            Topic: N/A

    A DEMONSTRATION OF THE FEASABILITY OF A LASER-ASSISTED CHEMICAL VAPOR DEPOSITION PROCESS FOR MERCURY CADIUM TELLURIDE FILMS UTILIZING LARGE AREA, UNIFORM RARE-GAS HALIDE EXCIMER LASER ILLUMINATION IS PROPOSED. AN INITIAL TASK FROM THIS PURPOSE WILL BE TO CONDUCT A TRADEOFF STUDY TO DETERMINE THE OPTIMUM GEOMETRY FO LAVCD. THIS WILL BE FOLOWED BY THE TASK OF DESIGNING, BUILDING AND TESTING AN APPRO ...

    SBIR Phase I 1983 Department of DefenseArmy
  9. ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS

    SBC: General Network Corp.            Topic: N/A

    THE ULTIMATE LONG-TERM OBJECTIVE OF THIS PROJECT IS TO ADAPT AND MODIFY GENERAL NETWORK'S TURNKEY PACKAGE, TOTAL SOLUTION, FOR MILITARY USE AS AN ADVANCED FACILITY TO EXPEDITE THE DESIGN AND EVALUATION OF COMMUNICATION SYSTEMS. TOTAL SOLUTION IS COMPRISED OF COMPUTER HARDWARE AND GENERAL NETWORK'S PROPRIETARY SOFTWARE. THIS SOFTWARE IS AN INNOVATIVE, MODULARIZED, INTERACTIVE GRAPHICS SYSTEM DEVELO ...

    SBIR Phase II 1989 Department of DefenseArmy
  10. AI FOR COMMAND AND CONTROL DECISION AIDS

    SBC: Con-solve Inc.            Topic: N/A

    THE PROPOSED WORK WILL BUILD UPON EXISTING TERRAIN MODELING AND ARTIFICAL INTELLIGENCE SYSTEMS TO DEVELOP A PROTOTYPE COMMAND AND CONTROL DECISION AID FOR ARMY COMMANDERS AND STAFF. A PROTOTYPE WILL BE DEVELOPED DURING PHASE I. THE NEW SYSTEM "TERRAIN PLAN," WILL BE IMPLEMENTED IN COMMAND LISP ON UNIX-BASED ENGINEERING WORKSTATIONS. TERRAIN PLAN WILL USE AN AI-BASED DECISION SUPPORT CORE TO UNIFY ...

    SBIR Phase I 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government