You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. ANALYSIS AND TRAINING OF AN ARTIFICIAL NEURAL NETWORK NETWORK NUCLEAR POWER PLANTACCIDENT DIAGNOSTIC ADVISOR

    SBC: Netrologic, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP AN ARTIFICIAL-INTELLIGENCE FAULT-DIAGNOSTIC SYSTEM THAT WILL CLASSIFY, IN REAL-TIME, NUCLEAR POWER PLANT TRANSIENTS AND PROVIDE ERROR BOUNDS ON ITS DIAGNOSES. THE GOAL IS TO DEVELOP AN ARTIFICIAL NEURAL NETWORK (ANN) PARADIGM THAT IS CAPABLE OF NOT ONLY PROVIDING A PROPER CLASSIFICATION BUT ALSO GIVING A FIGURE OF MERIT FOR ITS ANSWER. THE PROPO ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  2. AN ULTRA-HIGH SPEED RESIDUE NUMBER PROCESSOR FOR SAFT INSPECTION SYSTEM IMAGE ENHANCEMENT

    SBC: Sigma Research Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  3. A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS

    SBC: Metrolaser, Inc.            Topic: N/A

    THE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  4. ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  5. BWR RECIRCULATION INLET SAFE ENDS-A THREAT TO PLANT LIFE ANDSAFETY

    SBC: Aptech Engineering Services            Topic: N/A

    AN ON-GOING THREAT TO THE RESIDUAL LIFETIME AND SAFETY OF BOILING WATER REACTORS (BWRS) IS INTERGRANULAR STRESS CORROSION CRACKING (IGSCC). A COMPONENT OF SPECIAL CONCERN IN THE RECIRCULATION INLET NOZZLE SAFE END (RINSE). FOR EXAMPLE, WITHIN THE LAST 2 YEARS 30 OUT OF 30 RINSES ARE KNOWN TO BE CRACKED AT A 3-UNIT BWR SITE AND IT IS BELIEVED THAT 20 OUT OF 20 RINSES ARE CRACKED AT A 2-UNIT BWR SIT ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  6. COMBINING LASER MEASUREMENTS WITH BACKWARD WAVE TECHNIQUES FOR EVALUATION OF UNDERGROUND OPENINGS IN OIL SHALE

    SBC: Sigma Research Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  7. COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.

    SBC: Jfb Associates Inc.            Topic: N/A

    COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  8. DEVELOPMENT OF A REAL TIME LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    THE FEASIBILITY OF DEVELOPMENT OF A NEW LONG RANGE RADIOACTIVE PLUME TRANSPORT CODE IS PROPOSED. NEW APPROACHES TO ESTIMATE THE RADIOACTIVE DECAY, WET AND DRY DEPOSITION, PARTICULATE COAGULATION, AND ATMOSPHERIC PARAMETERS WILL BE EXPLORED AND A SIMPLE, IDEALIZED EVALUATION OF THESE ALGORITHMS WILL BE MADE IN PHASE I OF THE PROPOSED EFFORT. BASED ON THESE STUDIES A) AN APPROPRIATE NEAR SOURCE RISE ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  9. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1989 Nuclear Regulatory Commission
  10. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    A SELF-POWERED RADIATION DETECTOR THAT CAN BE USED TO DETECTTHE SOURCE POSITION IN INDUSTRIAL RADIOGRAPHIC EQUIPMENT IS NEEDED. SELF-POWERED DETECTORS HAVE TRADITIONALLY BEEN USEDINFLUX MAPPING SYSTEMS IN NUCLEAR REACTORS BECAUSE OF THEIR SIZE, RUGGEDNESS AND SIMPLICITY. THIS DETECTOR CONCEP PROVIDES THE UNIQUE OPPORTUNITY FOR THE DEVELOPMENT OF LARGECROSS SECTIONAL AREA DETECTORS THATCAN BE USED ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government