You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ACTIVITIES
SBC: General Systems Group Topic: N/AGSG HAS OBSERVED LIMITED SUPPORT OF MODERN PROGRAMMING PRACTICE BY DOD SOFTWARE CONTRACTORS DUE TO THE RISKS INVOLVED AND THE ABSENCE OF PAY-OFF DATA. CONTRACTORS ALSO HAVE A DIFFICULT TIME ACCRATELY ESTIMATING AND SCHEDULING QUALITY RELATED ACTIVITIES ON SOFTWARE OF QUALITY RELATED ACTIVITIES IN ORDER TO PROVIDE THE MODELS WHICH CAN BE USED TO (A) DETERMINE THE VALUE OF SUCH ACTIVITIES TO CONTRAC ...
SBIR Phase I 1983 Department of DefenseArmy -
ADAPTIVE CANCELLATION OF ENGINE NOISE
SBC: Signatron Acquisition Corp Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
ADAPTIVE RESOURCE ALLOCATION FOR ADVACED ELINT\ESM SYSTEMS
SBC: Greenbriar Systems Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
A DEMONSTRATION OF THE FEASABILITY OF A LASER-ASSISTED CHEMICAL VAPOR DEPOSITION PROCESS FOR MERCURY CADIUM TELLURIDE FILMS UTILIZING LARGE AREA, UNIFORM RARE-GAS HALIDE EXCIMER LASER ILLUMINATION IS PROPOSED.
SBC: Aracor Topic: N/AA DEMONSTRATION OF THE FEASABILITY OF A LASER-ASSISTED CHEMICAL VAPOR DEPOSITION PROCESS FOR MERCURY CADIUM TELLURIDE FILMS UTILIZING LARGE AREA, UNIFORM RARE-GAS HALIDE EXCIMER LASER ILLUMINATION IS PROPOSED. AN INITIAL TASK FROM THIS PURPOSE WILL BE TO CONDUCT A TRADEOFF STUDY TO DETERMINE THE OPTIMUM GEOMETRY FO LAVCD. THIS WILL BE FOLOWED BY THE TASK OF DESIGNING, BUILDING AND TESTING AN APPRO ...
SBIR Phase I 1983 Department of DefenseArmy -
AND FABRICATE BOTH A PROTOTYPE SUCTION SERVICE AND INFUSION DEVICE THAT WILL UTILIZED A MECHANICAL ROLLER PUMP POWERED WITH ALTERNATIVE MECHANISMS.
SBC: Triangle Research and Development Corporation Topic: N/AAND FABRICATE BOTH A PROTOTYPE SUCTION SERVICE AND INFUSION DEVICE THAT WILL UTILIZED A MECHANICAL ROLLER PUMP POWERED WITH ALTERNATIVE MECHANISMS. THE LIGHWEIGHT AND PORTABLE SUCTION DEVICE WILL BE EXPECTED TO PROVIDE CONTROLLED SUCTION OVER A WIDE RANGE OF VACUUM (10 TO 100 CM WATER) FOR VARIOUS TUBE AND OPERATIVE SITE USAGE. POWER FOR THE DEVICE WILL BE NON-ELECTRICAL AND MAY BE PRODUCED BY A S ...
SBIR Phase I 1983 Department of DefenseArmy -
AND PROCESSOR DEVELOPMENT FOR SELF CONTAINED MUNITIONS
SBC: SCIENTIFIC SYSTEMS CO INC Topic: N/ATHE TECHNICAL OBJECTIVE OF PHASE I IS TO DEMONSTRATE THE FEASIBILITY OF USING INNDVITIVE STATISTICAL PATTERN RECOGNITION ALGORITHMS TO PERFORM THE TARGET IDENTIFICATION FUNCTION APPICABLE TO AUTOMATIC TARGET CUEING FOR FIBER OPTIC GUIDED MUNITIONS AND AUTONOMOUS TARGET ACQUISITION FOR SELF-CONTAINED GUIDED MUNITIONS THAT USE A LOAL MODE OF OPERATION. THE SPECIFIC OBJECTIVE IS TO DEMONSTRARE A PROB ...
SBIR Phase I 1983 Department of DefenseArmy -
AN ELECTRONIC SYSTEM TROUBLESHOOTING PROGRAM USING ARTIFICIAL INTELLIGENCE TECHNIQUES.
SBC: Engineering Guild Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
AN EXPENDABLE DEVICE FOR MEASURING SUPERCOOLED LIQUID WATER IN CLOUDS
SBC: Atek Data Corp Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
AN INEXPENSIVE PEAK ACCELERATION INDICATOR FOR AIR CRASH MONITORING.
SBC: ANCO ENGINEERS, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
AN OPTICAL ADJUNCT ADD-ON MILLIMETER-WAVE (MMW) RADAR BEING CONSIDERED BY THE ARMY FOR RANGING TO INCOMMING RENTRY VEHICLES AND DECOY DISCRIMINATION BECAUSE OF THE LONG RANGE,LIMITED ATTENA APERATURE, AND LOW TARGET CROSS SECTION, A LARGE TRANSMITTED
SBC: CYBERDYNAMICS, INC. Topic: N/AAN OPTICAL ADJUNCT ADD-ON MILLIMETER-WAVE (MMW) RADAR BEING CONSIDERED BY THE ARMY FOR RANGING TO INCOMMING RENTRY VEHICLES AND DECOY DISCRIMINATION BECAUSE OF THE LONG RANGE,LIMITED ATTENA APERATURE, AND LOW TARGET CROSS SECTION, A LARGE TRANSMITTED ENERGY IS REQUIRED TO ACHIEVE ACCEPTABLE SIGNAL-NOISE RATIOS. LIMITATIONS ON THE PEAK POWER ACHIEVABLE AT MILLIMETER WAVELENGHTS LEADS TO A REQUIREME ...
SBIR Phase I 1983 Department of DefenseArmy