You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: BOSCH AEROSPACE, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  2. N/A

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseArmy
  3. N/A

    SBC: Intellectual Properties, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseMissile Defense Agency
  4. N/A

    SBC: PacMar Technologies LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  5. N/A

    SBC: Nomadics, Inc.            Topic: N/A

    N/A

    STTR Phase I 2000 Department of DefenseAir Force
  6. N/A

    SBC: SRS Technologies            Topic: N/A

    N/A

    STTR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency
  7. N/A

    SBC: TIME DOMAIN CORP.            Topic: N/A

    N/A

    STTR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency
  8. PORTABLE SOLAR POWERED WATER PURIFICATION AND DESALINATION SYSTEM DEVELOPMENT

    SBC: Spectra Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  9. DETECTION OF FATIGUE CRACKS IN MILITARY BRIDGES AND STRUCTURES

    SBC: Spectra Research, Inc.            Topic: N/A

    UNDER STEDILY REPEATED CYCLIC LOADING IMPOSED BY LIVE LOADS, FATIGUE CRACKS IN BRIDGES CAN BE INITIATED AT SMALL DEFECTS. BECAUSE DEFECTS CAN ELIMINATE THE INITIAL STAGE OF CRACK GROWTH, THE FATIGUE LIFE IS GREATLY REDUCED, ESPECIALLY IF FRACTURE IS CONTROLLED BY CRACK INITIATION. THEREFORE, THE FATIGUE CRACK GROWTH PROCESS IS REDUCE TO CRACK PROPAGATION AND UNSTABLE CRACK GROWTH. FATIGUE STUDIES ...

    SBIR Phase I 1983 Department of DefenseArmy
  10. THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE THE DESIGNER OF AN TI-RADIATION HOMING MISSILES WITH THE INFORMATION NECESSARY TO STRUCTURE FUTURE STUDIES AND TECHNOLOGY PROGRAMS AIMED AT DEVELOPING AN ANTI- RADIATION MISSILE CAPABLE OF HOMING ON

    SBC: Cas Inc.            Topic: N/A

    THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE THE DESIGNER OF AN TI-RADIATION HOMING MISSILES WITH THE INFORMATION NECESSARY TO STRUCTURE FUTURE STUDIES AND TECHNOLOGY PROGRAMS AIMED AT DEVELOPING AN ANTI- RADIATION MISSILE CAPABLE OF HOMING ON THREAT RADIATION MISSILE CAPABLE OF HOMING THREAT RADARS UTILIZING SPREAD SPECTRUM TECHNIQUES. THIS INVOLVES THE FOLLOWING TWO TASKS: 1. DEFINE THE C ...

    SBIR Phase I 1983 Department of DefenseAir Force
US Flag An Official Website of the United States Government