You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT ROBOTIC COMMAND CENTER PHASE II: IMPLEMENTING A HARDENED COMPACT UNIT

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  2. A COMPREHENSIVE PNS UPGRADE FOR THREE-DIMENSIONAL REENTRY FLOW PREDICTION

    SBC: Computational Mechan            Topic: N/A

    THE MISSION OF THIS PHASE I PROJECT IS COMPLETION OF A TRULY INNOVATIVE STUDY TO UPGRADE EXISTING PNS CODES FOR COMPUTING HIGHSPEED, THREE-DIMENSIONAL RE-ENTRY FLOWFIELDS. THE PLAN OF ACTION ENCOMPASSES A THOROUGH EXAMINATION OF THE RANGE OF ADMISSABLE CFD THEORIES, TO UNEQUIVACALLY COMPARE STRONG AND WEAK POINTS FOR APPLICATION TO THE REYNOLDS-AVERAGED NAVIER-STOKES EQUATIONS WITH DIFFERENTIAL EQ ...

    SBIR Phase II 1989 Department of DefenseAir Force
  3. A Distributed Adaptive Control System Based on Composable Agents

    SBC: MOBILE INTELLIGENCE CORP.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseDefense Advanced Research Projects Agency
  4. A Five-Function PCMCIA/CardBUS Device for Diagnostic Testing

    SBC: Nomadics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseAir Force
  5. A High-Speed Scanning Nanoprobe Head Using Carbon Nanotubes as Compliant Probes

    SBC: PIEZOMAX TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseDefense Advanced Research Projects Agency
  6. AN ADVANCED DILUTION HOLE CONCEPT TO REDUCE PATTERN FACTOR IN GAS TURBINE COMBUSTORS

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  7. AN AI BASED DECISION SUPPORT SYSTEM FOR SELECTION OF RAMP PROGRAM PARTS CANDIDATES

    SBC: Dialog Systems Inc.            Topic: N/A

    THE OBJECTIVES OF THIS PROPOSAL ARE TWOFOLD. FIRST IS TO DEVELOP A DETAILED CONCEPTUAL DESIGN OF AN OPERATIONAL DECISION SUPPORT SYSTEM (DSS) FOR THE SELECTION OF RAMP PROGRAM PARTS CANDIDATES, AND SECONDLY, TO DEVELOP A PROTOTYPE OF THE MORE CRITICAL ELEMENTS OF THE DSS SYSTEM. THE ENVISIONED SYSTEM WILL CONSIST OF AUTOMATED INPUT AND OUTPUT COMMUNICATION LINKS, A DECISION SUPPORT SYSTEM RESIDENT ...

    SBIR Phase II 1989 Department of DefenseNavy
  8. ANALYTIC METHODS FOR ELECTRONIC WARFARE VULNERABILITY ASSESSMENTS

    SBC: Vector Research Company, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  9. A NOVEL TECHNIQUE FOR STUDYING WATER ASSOCIATED WITH OPTICAL FIBERS

    SBC: H & N Instruments Inc            Topic: N/A

    THE DEGRADATION IN OPTICAL AND MECHANICAL PROPERTIES OF FIBERS CAUSED BY ATMOSPHERIC WATER IS A SERIOUS PROBLEM. LITTLE IS KNOWN, HOWEVER, OF THE TYPES AND QUANTITIES OF WATER ACTUALLY ASSOCIATED WITH OPTICAL FIBERS, AND THE MECHANISM FOR THE DELETERIOUS EFFECT OF THESE STATES OF WATER. THIS PROJECT WILL UTILIZE A NEW METHOD TO STUDY THE WATER ASSOCIATED WITH OPTICAL FIBERS. THE METHOD CONTINUOUSL ...

    SBIR Phase II 1989 Department of DefenseArmy
  10. ANTENNA CROSS-COUPLING IN A DAMPED RESONANT CAVITY

    SBC: SIMULATION TECHNOLOGIES, INC            Topic: N/A

    A THEORETICAL ANALYSIS OF THE 4-WIRE TEM GENERATOR BY LIEPA AND JAREM HAS SHOWN THAT UNIFORM TEM WAVES CAN BE GENERATED OVER A 6 FT. DIAMETER TARGET REGION AT VHF FREQUENCIES. WE HYPOTHESIZE THAT BOTH POLARIZATION AND PHASE FRONT TILT CAN BE ACHIEVED ALSO WITH THIS SYSTEM BY CONTROLLING THE FOUR EXCITATION CURRENTS INDEPENDENTLY. FOR THIS PHASE I EFFORT SIMULATION TECHNOLOGIES PROPOSES TO BUILD AN ...

    SBIR Phase I 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government