You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Scalable Adaptive Fiber-Array Elements (SAFARE) for Directed Energy Phased Arrays
SBC: MV INNOVATIVE TECHNOLOGIES, LLC Topic: AF12BT13Optonicus, in collaboration with the University of Dayton has demonstrated the feasibility of a new Scalable Adaptive Fiber-Array Elements (SAFARE) phased fiber-array beam director architecture in Phase I to address the DoD need for HEL directed energy systems. The SAFARE system integrates a new high fill factor fiber-array architecture with novel imaging, sensing, and control capabilities that en ...
STTR Phase II 2015 Department of DefenseDefense Advanced Research Projects Agency -
Modeling Leadership Dynamics in Multinational Environments
SBC: MacroCognition, LLC Topic: ST092002We propose to develop a computational model of leadership designed to capture complex variables including cultural differences in leadership requirements along with task differences, primarily ill-defined goals, which pose leadership challenges. Rather than avoiding these kinds of complexity and developing a computational model that is unlikely to scale up, we believe there is more to be gained b ...
STTR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: ADVANCED WIRELESS & TELECOM CORP. Topic: N/AN/A
STTR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency