You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
N/A
SBC: CHI SYSTEMS INC Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: DISCOVERY MACHINE INC Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
Integrated Solutions for Packaging of High Power Electronics
SBC: k Technology Corporation Topic: N/AN/A
SBIR Phase II 2000 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: MAYA DESIGN Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: NANOMAT, INC. Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
Computer Assisted Modeling of Urban Environments
SBC: TERRASIM, INC. Topic: N/AN/A
SBIR Phase II 2000 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: TERRASIM, INC. Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
Development Of An Ultra Fast Range Sensor
SBC: K2T, Inc. Topic: N/ARange imaging is the measurement of the three-dimensional shape of an object as an array of 3-D distance values. While range imaging is a critical robotic sensing techonology, existing methods are very slow; the best current devices still produce only a few tens of frames per second. We propose to develop an ultra fast range imaging system consisting of a scanning laser and a sensor array of photo ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
DEVELOPMENT OF AN INTEGRATED DESIGN AND AUTOMATED FIBER PLACEMENT SYSTEM
SBC: MATERIALS SCIENCES LLC Topic: N/ATHE OPPORTUNITY IS TO DEVELOP AN INNOVATIVE DESIGN SYSTEM FOR COMPOSITE PARTS WITH COMPLEX SHAPES WHICH INTEGRATES ADVANCED MATERIALS MODELING TECHNIQUES, STRUCTURAL OPTIMIZATION AND AUTOMATED SOFTWARE FOR MANUFACTURING PROCESS DEVELOPMENT. THE PROPOSED PROGRAM WILL EXPLORE THE DEVELOPMENT OF THE TECHNOLOGIES WHICH INTEGRATE COMPOSITE MATERIALS DESIGN METHODS WITH ROBOTICS MANIPULATOR CODE FOR CON ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
Engine Infra-Red (IR) Signature Suppression
SBC: PIASECKI AIRCRAFT CORP Topic: N/AThe objective of this project is to develop a lightweight, low drag IR (infra-red light spectrum) suppression system for SOF aircraft. Power, weight and aircraft performance are negatively effected by traditinal suppression concepts and therefore, a new approach to the design problem is required. The proposed design effort will explore a unique design solution to reduce weight and aircraft drag. ...
SBIR Phase I 1995 Department of DefenseSpecial Operations Command