You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
INTENSE GAMA-RAY BEAMS
SBC: Applied Research Associates, Inc. Topic: N/ASTANDARD MONTE CARLO AND FN METHODS FOR RADIATION TRANSPORT WILL BE USED TO STUDY A NEWLY PROPOSED SHIELD CONFIGURATION FOR PROTECTION AGAINST PARALLEL OR SLIGHTLY DIVERING GAMA RAY BEAMS IN A SPACE (NON-SCATTTERING) ENVIRONMENT. THE NEW CONFIGURATION EMPLOYS LAYERED SHIELDS, WITH CONSIDERABLE SEPARATION BETWEEN THE LAYERS, TO SHADOW THE TARGET, OF THE ASSUMPTION THAT THE DIRECTION OF INCIDENCE IS ...
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
ESTABLISH DESIGN CRITERIA FOR, AN OPTICAL PROBE TO MEASURE THE DUST LOFTED BY THE SHOCK WAVE DURING A NUCLEAR BLAST WAVE SIMULATION.
SBC: DYNAMICS TECHNOLOGY, INC. Topic: N/AESTABLISH DESIGN CRITERIA FOR, AN OPTICAL PROBE TO MEASURE THE DUST LOFTED BY THE SHOCK WAVE DURING A NUCLEAR BLAST WAVE SIMULATION. DUST DENSITY IS DETERMINED FROM THE REDUCTION IN INTENSITY OF LIGHT PROJECTED OVER AN INTERROGATION PATH TRANSVERSE TO THE FLOW. USE OF A SIMPLE LIGHT SOURCE AND DETECTOR WITH FIBER OPTIC TRANSMISSION LINES PRODUCES AN INEXPENSIVE RUGGED INSTRUMENT WHICH CAN BE DEPLO ...
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
DETERRENCE TO STRATEGIC DEFENSE
SBC: Econ, Inc. Topic: N/ATHE ADVANCE OF TECHNOLOGIES MAY MAKE DEFENSE AGAINST BALLISTIC MISSLES TECHNICALLY AND ECONOMICALLY FEASIBLE. A NATIONAL POLICY DEBATE HAS BEGUN ON THE DESIRABILITY OF MAKING A TRANSITION FROM STRATEGIC DETERRANCE TO STRATEGIC DEFENSE. THE DEBATE IS AT PRESENT HIGHLY CONFUSING AND UNSTRUCTURED, SINCE THE VARIOUS ARGUMENTS FOR AND AGAINST THAT TRANSITION ARE BASED ON DIFFERING ASSUMPTIONS, OFTEN TA ...
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
THE PURPOSE OF THIS BRIEF STUDY IS TO REVIEW THE PRESENT STATUS OF ENHANCED RADIATION WEAPONS FROM A TECHNICAL, MILITARY, AND POLITICAL POINT OF VIEW, AND TO MAKE RECOMMENDATIONS REGARDING THE FUTURE OF THESE WEAPONS.
SBC: La Mancha Company Topic: N/ATHE PURPOSE OF THIS BRIEF STUDY IS TO REVIEW THE PRESENT STATUS OF ENHANCED RADIATION WEAPONS FROM A TECHNICAL, MILITARY, AND POLITICAL POINT OF VIEW, AND TO MAKE RECOMMENDATIONS REGARDING THE FUTURE OF THESE WEAPONS. THERE ARE A NUMBER OF INTERRELATED REASONS FOR UNDERTAKING SUCH A TASK AT THIS TIME. FOR A NUMBER OF REASONS THERE APPEARS TO BE A GENERAL RELUCTANCE TO CONTINUE THE ERW DEBATE AT TH ...
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
DC- 20GHZ Q-DOT RESEARCH PROPOSAL 1035, PART 1--TECHNICAL PROPOSAL
SBC: Q-DOT, INC. Topic: N/AUNIQUE CHARGE-COUPLED DEVICES MAY BE ABLE TO RECORD PHENOMENA WITH INFORMATION SPANNING DC - 20GHZ. DATA TO BE RECORDED IS SAMPLED AT RATES UP TO 100 GS/S AND STORED TEMPORARILY IN THE CCD. IT IS THEN SHIFTED AT SLOW RATES INTO A CONVENTIONAL A/D AND DIGITAL MEMORY. PRELIMINARY RESEARCH SUGGESTS BROAD TRADE-OFFS AMONG RECORD LENGTH, SAMPLING INTERVAL, DYNAMIC RANGE, AND OTHER FACTORS. OUR FIRST ST ...
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
PULSED SHORT WAVELENGTHS LASER EFFECTS SIMULATORS
SBC: Schafer Corporation Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
OF SILICON DEVICES TO ALPHA PARTICLE RADIATION
SBC: SCIENTIFIC RESEARCH ASSOC., INC. Topic: N/ASOFT ERRORS INDUCED BY IONIZING PARTICLES CONSTITUTE ONE OF THE MOST PRESSING PROBLEMS OF PRESENT SEMICONDUCTOR TECHNOLOGY. HARDENING MEASURES HAVE BEEN ATTEMPTED EMPIRICALLY AND THROUGH CIRCUIT SIMULATION, DESIGN MODIFICATION, AND DEVICE SIMULATION. A NECESSARY COMPONENT TO THESE STUDIES IS AN ACCURATE REPRESENTATION OF CIRCUIT RESPONSE, CHARGE COLLECTED, AND IN SOME CASES THE FUNNEL LENGTH. INSO ...
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency -
REAL-TIME ADAPTIVE NUCLEAR CLUTTER MITIGATION
SBC: VISIDYNE, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseDefense Threat Reduction Agency