You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TRACKING PROGRESSIVE FRACTURE\TOWARDS RETIREMENT FOR CAUSE

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  2. NOVEL APPROACHES TO FASIL POLYMERS

    SBC: AMT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  3. EXTREME SEAWAY LOADS CHARACTERIZATION FOR SHIP STRUCTURE

    SBC: BAND, LAVIS & ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  4. THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) NEEDS A METHODOLOGY TO PROVIDE A MEANS OF IDENTIFYING, EVALUATING, AND PRIORITIZING THOSE TECHNOLOGIES WHICH BEST MEET FUTURE NAVY OPERATIONAL NEEDS IN AREAS OF NAVAIR INTEREST.

    SBC: B-k Dynamics Inc            Topic: N/A

    THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) NEEDS A METHODOLOGY TO PROVIDE A MEANS OF IDENTIFYING, EVALUATING, AND PRIORITIZING THOSE TECHNOLOGIES WHICH BEST MEET FUTURE NAVY OPERATIONAL NEEDS IN AREAS OF NAVAIR INTEREST. TO THIS END, BKD PROPOSES TO: (1) DEVELOP CHARACTERISTICS AND EVALUATION CRITERIA FOR A METHODOLOGY WHICH WILL ACCOMPLISH THIS GOAL; (2) DEVELOP DESCRIPTIONS OF EXISTING RELEVANT METH ...

    SBIR Phase I 1983 Department of DefenseNavy
  5. TECHNIQUE AS A FATIGUE INDICATOR FOR MILITARY BRIDGES

    SBC: Daedalean Associates, Inc.            Topic: N/A

    THE DEVELOPMENT OF THE INTERNAL FRICTION DAMPING NON- DESTRUCTIVE EVALUATION TECHNIQUE AS A FATIGUE INDICATOR FOR MILITARY BRIDGES. A NONDESTRUCTIVE TEST TECHNIQUE WHICH HAS THE POTENTIAL FOR MEASURING THE DEGREE OF FATIGUE IN MILITARY BRIDGE STRUCTURES HAS BEEN INDENTIFIED BY US. THE TECHNIQUE IS CALLED INTERNAL FRICTION DAMPING NONDESCTRUCTIVE EVALUATION. THE PHYSICAL PROPERTY THAT IS MONITORED ...

    SBIR Phase I 1983 Department of DefenseArmy
  6. ANALYTICAL DECISION MAKING SOFTWARE- PHASE I

    SBC: Doty Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  7. DISTRIBUTED PROBLEM-SOLVING ENVIRONMENT

    SBC: LNK CORP., INC.            Topic: N/A

    A TACTICAL OPERATIONS CENTER (TDC) CAN BE MODELLED BY A DISTRIBUTED PROBLEM-SOLVING ENVIRONMENT. ONE OF THE FUNCTIONS OF A TDC IS THE GATHERING AND INTERPRETATION OF INTELLIGENCE . THE REQUIREMENTS FOR INTERPRETATION OF INTELLIGENCE MAKE SEVERE DEMANDS ON AVAILABLE PERSONNEL DURING COMBAT SITUATIONS DUE TO THE LARGE AMOUNTS OF INFORMATION AN ITS UNRELIABILITY. WE PROPOSE TO STUDY A DISTRIBUTED PRO ...

    SBIR Phase I 1983 Department of DefenseArmy
  8. AN A.I. APPROACH FOR TARGET RECOGNITION IN REAL BATTLE ENVIRONMENTS

    SBC: LNK CORP., INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  9. DEVELOPMENT OF A NEW TYPE OF RADAR ABSORBING MATERIAL

    SBC: Technical Resource Group            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  10. DETECTION, LOCALIZATION AND CLASSIFICATION OF A REMOTE DETONATION AT SEA

    SBC: Underwater Systems Inc.            Topic: N/A

    THE PURPOSE OF THE PROPOSED PROJECT IS TO PROVIDE AN ALGORITHMIC DESIGN OF A SYSTEM FOR THE FOR THE DETECTION, LOCALIZATION AND CLASSIFICATION (ALTITUDE\DEPTH AND YIELD) OF A REMOTE DETONATION AT SEA USING HYDROACOUSTIC DATA. THIS INFORMATION CAN BE OBTAINED FROM THE SIGNAL POWER SPECTRUM LEVELS, SIGNAL ARRIVAL TIMES AND REVERBERATION TIME HISTORIES OBSERVED BY THE MONITORING HYDROPHONES AND ESTIM ...

    SBIR Phase I 1983 Department of DefenseNavy
US Flag An Official Website of the United States Government