You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TRACKING PROGRESSIVE FRACTURE\TOWARDS RETIREMENT FOR CAUSE
SBC: Advanced Technologies/Laboratories Intl Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA.
SBC: Advanced Applied Technology Topic: N/ACURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA. A VIDEO DISPLAY WITH BORESIGHTED CROSSHAIR IS USED FOR OPERATOR DISPLAY. THIS PROPOSAL IS TO PROVIDE A REAL TIME READOUT OF CALIBRATED BACKGROUND OR TARGET CROSS SECTION ON THE VIDEO DISPLAY TO ENABLE BETTER USE OF FLIGHT TIME. THE READOUT WOULD ALSO BE ...
SBIR Phase I 1983 Department of DefenseArmy -
NOVEL APPROACHES TO FASIL POLYMERS
SBC: AMT, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
EXTREME SEAWAY LOADS CHARACTERIZATION FOR SHIP STRUCTURE
SBC: BAND, LAVIS & ASSOC., INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseNavy -
THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) NEEDS A METHODOLOGY TO PROVIDE A MEANS OF IDENTIFYING, EVALUATING, AND PRIORITIZING THOSE TECHNOLOGIES WHICH BEST MEET FUTURE NAVY OPERATIONAL NEEDS IN AREAS OF NAVAIR INTEREST.
SBC: B-k Dynamics Inc Topic: N/ATHE NAVAL AIR SYSTEMS COMMAND (NAVAIR) NEEDS A METHODOLOGY TO PROVIDE A MEANS OF IDENTIFYING, EVALUATING, AND PRIORITIZING THOSE TECHNOLOGIES WHICH BEST MEET FUTURE NAVY OPERATIONAL NEEDS IN AREAS OF NAVAIR INTEREST. TO THIS END, BKD PROPOSES TO: (1) DEVELOP CHARACTERISTICS AND EVALUATION CRITERIA FOR A METHODOLOGY WHICH WILL ACCOMPLISH THIS GOAL; (2) DEVELOP DESCRIPTIONS OF EXISTING RELEVANT METH ...
SBIR Phase I 1983 Department of DefenseNavy -
TECHNIQUE AS A FATIGUE INDICATOR FOR MILITARY BRIDGES
SBC: Daedalean Associates, Inc. Topic: N/ATHE DEVELOPMENT OF THE INTERNAL FRICTION DAMPING NON- DESTRUCTIVE EVALUATION TECHNIQUE AS A FATIGUE INDICATOR FOR MILITARY BRIDGES. A NONDESTRUCTIVE TEST TECHNIQUE WHICH HAS THE POTENTIAL FOR MEASURING THE DEGREE OF FATIGUE IN MILITARY BRIDGE STRUCTURES HAS BEEN INDENTIFIED BY US. THE TECHNIQUE IS CALLED INTERNAL FRICTION DAMPING NONDESCTRUCTIVE EVALUATION. THE PHYSICAL PROPERTY THAT IS MONITORED ...
SBIR Phase I 1983 Department of DefenseArmy -
ANALYTICAL DECISION MAKING SOFTWARE- PHASE I
SBC: Doty Associates Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseNavy -
DISTRIBUTED PROBLEM-SOLVING ENVIRONMENT
SBC: LNK CORP., INC. Topic: N/AA TACTICAL OPERATIONS CENTER (TDC) CAN BE MODELLED BY A DISTRIBUTED PROBLEM-SOLVING ENVIRONMENT. ONE OF THE FUNCTIONS OF A TDC IS THE GATHERING AND INTERPRETATION OF INTELLIGENCE . THE REQUIREMENTS FOR INTERPRETATION OF INTELLIGENCE MAKE SEVERE DEMANDS ON AVAILABLE PERSONNEL DURING COMBAT SITUATIONS DUE TO THE LARGE AMOUNTS OF INFORMATION AN ITS UNRELIABILITY. WE PROPOSE TO STUDY A DISTRIBUTED PRO ...
SBIR Phase I 1983 Department of DefenseArmy -
AN A.I. APPROACH FOR TARGET RECOGNITION IN REAL BATTLE ENVIRONMENTS
SBC: LNK CORP., INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseNavy -
DETECTION MONITORING AND ALARM
SBC: Pcp, Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy