You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACROSS THE RURAL SOUTH.

    SBC: Forest Care Company            Topic: N/A

    MILLIONS OF ACRES OF UNMANAGED PRIVATE NON-INDUSTRIAL FORESTLAND ACROSS THE RURAL SOUTH PRESENT AN EXTRAORDINARY OPPOR- TUNITY TO CREATE NEW BUSINESSES AND JOBS. MOST PRESENT FORESTRY CONTRACTORS WHO PROVIDE SERVICES SUCH AS TIMBER HARVESTING AND SITE PREPARATION OPERATE WITH EQUIPMENT TOO LARGE AND INEFFICIENT FOR LANDOWNERS. TO ASSIST LANDOWNERS IN BEGINNING INTENSIVE MANAGEMENT, ADDITIONAL NEW ...

    SBIR Phase I 1983 Department of Agriculture
  2. ADAPTIVE LINEAR ESTIMATION IS A POWERFUL TECHNIQUE FOR RETRIEVING INFORMATION FROM NOISE CORRUPTED SIGNALS WITH UNKNOWN, TIME-VARYING, SIGNAL AND NOISE STATISTICS.

    SBC: Integrated Systems I            Topic: N/A

    ADAPTIVE LINEAR ESTIMATION IS A POWERFUL TECHNIQUE FOR RETRIEVING INFORMATION FROM NOISE CORRUPTED SIGNALS WITH UNKNOWN, TIME-VARYING, SIGNAL AND NOISE STATISTICS. IT HAS BEEN RARELY APPLIED TO COMMUNICATION APPLICATIONS BECAUSE OF THE PROHIBITIVE COMPLEXITY AND COST OF THE REQUIRED DIGITAL SIGNAL PROCESSING WHEN IMPLEMENTED ON A GENERAL PURPOSE SEQUENTIAL COMPUTER. THIS PROJECT COMBINES PARALLEL ...

    SBIR Phase I 1983 National Science Foundation
  3. ADDING HEURISTIC KNOWLEDGE TO COMPUTER ALGEBRA SYSTEMS

    SBC: Inference Corp.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy
  4. A DEMONSTRATION OF THE FEASABILITY OF A LASER-ASSISTED CHEMICAL VAPOR DEPOSITION PROCESS FOR MERCURY CADIUM TELLURIDE FILMS UTILIZING LARGE AREA, UNIFORM RARE-GAS HALIDE EXCIMER LASER ILLUMINATION IS PROPOSED.

    SBC: Aracor            Topic: N/A

    A DEMONSTRATION OF THE FEASABILITY OF A LASER-ASSISTED CHEMICAL VAPOR DEPOSITION PROCESS FOR MERCURY CADIUM TELLURIDE FILMS UTILIZING LARGE AREA, UNIFORM RARE-GAS HALIDE EXCIMER LASER ILLUMINATION IS PROPOSED. AN INITIAL TASK FROM THIS PURPOSE WILL BE TO CONDUCT A TRADEOFF STUDY TO DETERMINE THE OPTIMUM GEOMETRY FO LAVCD. THIS WILL BE FOLOWED BY THE TASK OF DESIGNING, BUILDING AND TESTING AN APPRO ...

    SBIR Phase I 1983 Department of DefenseArmy
  5. A DEVICE FOR FAILURE TOLERANT TRANSMISSION LINE DESIGN

    SBC: ANCO ENGINEERS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy
  6. ADVANCED AIRCRAFT FLIGHT CONTROL SYSTEM

    SBC: Systems Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  7. ADVANCED ANTENNA WINDOW PERFORMANCE AND REQUIREMENT DEFINITION

    SBC: Pda Engineering            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  8. ADVANCED FLIGHT PLANNING SYSTEM

    SBC: ANALYTICAL MECHANICS ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  9. ADVANCED MONOLITHIC GALLIUM-ARSENIDE SWITCH MATRIX

    SBC: Microwave Monolithics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  10. ADVANCES IN MICRO-ELECTRONICS HAVE MADE COMPUTER-ASSISTED VISION POSSIBLE, BUT EXPENSIVE.

    SBC: ANCO ENGINEERS, INC.            Topic: N/A

    ADVANCES IN MICRO-ELECTRONICS HAVE MADE COMPUTER-ASSISTED VISION POSSIBLE, BUT EXPENSIVE. EVEN SIMPLE COMPUTER VISIONSYSTEMS COST IN EXCESS OF $5,000, WELL OUT OF THE ECONOMIC REACH OF THE BLIND, WHO ARE GENERALLY LOW PAID OR DEPENDENT ON GOVERNMENT SUPPORT. THIS PROJECT PROPOSES TO USE MAINLY EXISTING PRODUCTS WHOSE COSTS HAVE BEEN REDUCED BY HIGH VOLUME SALES. THE GOAL IS TO PRODUCE A DEVICE WIT ...

    SBIR Phase I 1983 Department of Health and Human Services
US Flag An Official Website of the United States Government