You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACROSS THE RURAL SOUTH.

    SBC: Forest Care Company            Topic: N/A

    MILLIONS OF ACRES OF UNMANAGED PRIVATE NON-INDUSTRIAL FORESTLAND ACROSS THE RURAL SOUTH PRESENT AN EXTRAORDINARY OPPOR- TUNITY TO CREATE NEW BUSINESSES AND JOBS. MOST PRESENT FORESTRY CONTRACTORS WHO PROVIDE SERVICES SUCH AS TIMBER HARVESTING AND SITE PREPARATION OPERATE WITH EQUIPMENT TOO LARGE AND INEFFICIENT FOR LANDOWNERS. TO ASSIST LANDOWNERS IN BEGINNING INTENSIVE MANAGEMENT, ADDITIONAL NEW ...

    SBIR Phase I 1983 Department of Agriculture
  2. A DROPLET GENERATOR CAPABLE OF PRODUCING DROPLETS IN THE SIZE RANGE OF 40 TO 400 MICROMETERS WILL BE DEVELOPED.

    SBC: Tsi Inc.            Topic: N/A

    A DROPLET GENERATOR CAPABLE OF PRODUCING DROPLETS IN THE SIZE RANGE OF 40 TO 400 MICROMETERS WILL BE DEVELOPED. THIS DROPLET GENERATOR OPERATES ON THE PRINCIPLE OF LIQUID JET BREAK-UP BY MECHANICAL VIBRATION. WITH THIS TYPE OF GENERATOR, THE OPERATING PARAMETERS CAN UNIQUELY DEFINE THE DROPLET SIZE. THE GENERATOR IS MADE ADAPTABLE TO HIGH VISCOSITY LIQUIDS BY SELECTION OF VIBRATION AMPLITUDES AND ...

    SBIR Phase I 1986 Department of DefenseArmy
  3. A DUAL LEVEL TEMPERATURE WARNING SWITCH IS TO BE DESIGNED, PROTOTYPED, AND VERIFIED TO MEET TECHNICAL SPECIFICATIONS.

    SBC: TECHNOLOGY FOR ENERGY CORP.            Topic: N/A

    A DUAL LEVEL TEMPERATURE WARNING SWITCH IS TO BE DESIGNED, PROTOTYPED, AND VERIFIED TO MEET TECHNICAL SPECIFICATIONS. THE PROTOTYPE DUAL LEVEL TEMPERATURE WARNING SWITCH WILL BE DESIGNED IN MINIATURE, MAKING IT INTERCHANGEABLE WITH THE CURRENT SINGLE LEVEL TEMPERATURE WARNING SWITCH SPECIFIED IN MIL-S-12285/2C, 22 JULY 1975. THE PHASE I RESULTS WILL ESTABLISH THE VIABILITY OF THE DESIGN. THE MANUF ...

    SBIR Phase I 1986 Department of DefenseArmy
  4. A LITERATURE REVIEW OF FUNGALLY DERIVED ANTITUMOR AGENTS REVEALS THAT THE FUNGI CONSTITUTE A GROUP OF EASILY COLLECTED SPECIES INDIGENOUS TO WESTERN EUROPE, THE EASTERN UNITED STATES, AND JAPAN.

    SBC: Mycosearch Inc            Topic: N/A

    A LITERATURE REVIEW OF FUNGALLY DERIVED ANTITUMOR AGENTS REVEALS THAT THE FUNGI CONSTITUTE A GROUP OF EASILY COLLECTED SPECIES INDIGENOUS TO WESTERN EUROPE, THE EASTERN UNITED STATES, AND JAPAN. THEIR AVAILABILITY MAY HAVE BEEN THE DECISIVE FACTOR IN THESE DRUG DISCOVERIES. SIGNIFICANTLY, THEIR HABITAT RANGES ARE BROAD AND SUGGEST THAT OTHER SAPROPHYTIC AND PARASITIC FUNGI, WORLDWIDE, MAY HAVE DEV ...

    SBIR Phase I 1986 Department of Health and Human Services
  5. AMONG THE MANY ALTERNATIVES POSSIBLE TO U.S. INDUSTRY, SUCCESSFUL EXPANSION OF THE RANGE OF MICROBES CAN HELP FIND WAYS TO UTILIZE LIGNOCELLULOSE AND TO SWITCH TO RENEWABLE RSOURCES FOR SPECIALTY CHEMICALS AND AWAY FROM PETROLEUM. IT CAN HELP REDUCE POLLU

    SBC: Triangle Research and Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Health and Human Services
  6. AN ADVANCED RESPIRATORY PROTECTIVE DEVICE

    SBC: Tsi Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Health and Human Services
  7. ANALYSIS AND DESIGN ENHANCEMENT OF THE ADVANCED SERVOMANIPULATOR SYSTEM (ASM)

    SBC: Telerobotics International,            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Energy
  8. ANALYSIS OF DIGOXIN IN SERUM USING A SIMPLE IMMUNOASSAY

    SBC: GENESIS LABORATORIES, INC.            Topic: N/A

    THE LONG-TERM OBJECTIVE OF THIS WORK IS TO DEVELOP A RAPID, COLORIMETRIC, INSTRUMENT-DEPENDENT ASSAY FOR CARDIO-DIGITALIS CONSTITUENTS, NOTABLY DIGOXIN AND DIGITOXIN. GENESIS LABS' ""IMMUNOSTRIP'' ASSAY (PROTECTED BY PATENT) IS CONSTRUCTED IN A CONFIGURATION THAT IS APPLICABLE FOR THE RAPID DETECTION OF DRUGS AND METABOLITES IN BIOLOGICAL FLUIDS, E.G., URINE, BLOOD, OR SALIVA. THE RELATIVE SIMPLIC ...

    SBIR Phase II 1986 Department of Health and Human Services
  9. AND FABRICATE BOTH A PROTOTYPE SUCTION SERVICE AND INFUSION DEVICE THAT WILL UTILIZED A MECHANICAL ROLLER PUMP POWERED WITH ALTERNATIVE MECHANISMS.

    SBC: Triangle Research and Development Corporation            Topic: N/A

    AND FABRICATE BOTH A PROTOTYPE SUCTION SERVICE AND INFUSION DEVICE THAT WILL UTILIZED A MECHANICAL ROLLER PUMP POWERED WITH ALTERNATIVE MECHANISMS. THE LIGHWEIGHT AND PORTABLE SUCTION DEVICE WILL BE EXPECTED TO PROVIDE CONTROLLED SUCTION OVER A WIDE RANGE OF VACUUM (10 TO 100 CM WATER) FOR VARIOUS TUBE AND OPERATIVE SITE USAGE. POWER FOR THE DEVICE WILL BE NON-ELECTRICAL AND MAY BE PRODUCED BY A S ...

    SBIR Phase I 1983 Department of DefenseArmy
  10. AND KRYPTON-85 ATOM COUNTING

    SBC: ATOM SCIENCES, INC.            Topic: N/A

    IN THE DISPOSAL OF HAZARDOUS WASTES, ATTENTION MUST BE DIRECTED NOT ONLY TO THE PROBLEMS OF SAFE COLLECTION, TRANSPORTATION AND STORAGE, BUT ALSO TO THE PROBLEM OF ISOLATING THE HAZARDOUS MATERIAL FOR A LONG TIME. THIS IS ESPECIALLY TRUE FOR RADIOACTIVE WASTES, WHICH NEED TO BE ISOLATED FOR MANY THOUSANDS OF YEARS. UNDERGROUND DISPOSAL IS AN OPTION THAT SHOW CONSIDERABLE PROMISE IF ASSURANCES CAN ...

    SBIR Phase I 1986 Department of Energy
US Flag An Official Website of the United States Government