You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACROSS THE RURAL SOUTH.

    SBC: Forest Care Company            Topic: N/A

    MILLIONS OF ACRES OF UNMANAGED PRIVATE NON-INDUSTRIAL FORESTLAND ACROSS THE RURAL SOUTH PRESENT AN EXTRAORDINARY OPPOR- TUNITY TO CREATE NEW BUSINESSES AND JOBS. MOST PRESENT FORESTRY CONTRACTORS WHO PROVIDE SERVICES SUCH AS TIMBER HARVESTING AND SITE PREPARATION OPERATE WITH EQUIPMENT TOO LARGE AND INEFFICIENT FOR LANDOWNERS. TO ASSIST LANDOWNERS IN BEGINNING INTENSIVE MANAGEMENT, ADDITIONAL NEW ...

    SBIR Phase I 1983 Department of Agriculture
  2. Advanced Low-Cost Turbojet Engine

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    Not Available A program is presented for developing ceramic materials for operation at 3700-4900 F (2038-2704 C) with non-aluminized propellants and at 4900-6200 F (2704-3427 C) with aluminized propellants. At the lower temperature range the promising HfBx-HfCy-SiC-XX compositions will be evaluated where XX are rare earth borides such as YB2. These alloys (without XX) exhibited very good perfor ...

    SBIR Phase I 1999 Department of DefenseNavy
  3. Advanced Nonlinear Adaptive Controllers for Fault Tolerant Satellite Trajectory Control

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseAir Force
  4. Advanced Projectile Targeting Method

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  5. A GENE BASED THERAPEUTIC FOR ACUTE LUNG INJURY

    SBC: Generx+, Inc.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of Health and Human Services
  6. A Learning Algorithm for Multi-Ship Flight Path Management

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  7. AMONG THE MANY ALTERNATIVES POSSIBLE TO U.S. INDUSTRY, SUCCESSFUL EXPANSION OF THE RANGE OF MICROBES CAN HELP FIND WAYS TO UTILIZE LIGNOCELLULOSE AND TO SWITCH TO RENEWABLE RSOURCES FOR SPECIALTY CHEMICALS AND AWAY FROM PETROLEUM. IT CAN HELP REDUCE POLLU

    SBC: Triangle Research and Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Health and Human Services
  8. AMPLIFIED IMMUNOASSAY OF BACTERIA AND RECOVERY

    SBC: Amplistar, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of Health and Human Services
  9. An Advanced Cold Moderator Using Solid Methane Pellets

    SBC: Cryogenic Applications F, Inc.            Topic: N/A

    Not Available AEPTEC proposes to provide a COMMON TACTICAL 3D PICTURE to all surface combatants operating in a battle group, by implementing advanced connectivity technologies that will support the sharing of a 3D tactical picture. AEPTEC has teamed with Lockheed Martin, and Multispectral Solutions, Inc. (MSSI) to offer a high bandwidth connectivity solution that will enable every ship's CIC to s ...

    SBIR Phase I 1999 Department of Energy
  10. An Asynchronous Testbed for Low Power DSPs

    SBC: THESUS LOGIC, INC.            Topic: N/A

    Not Available SBIR N99-102, Automated Test & Integation Methods for COTS Hardware & Software Components, seeks an innovative approach to testing COTS using a Hot Box or alternative concept for pre-integration testing. The solution is expected to: 1. Reduce logistics material and testing associated with Combat System supportability. 2. Result in a significant cost and time savings to the Navy lo ...

    SBIR Phase I 1999 Department of DefenseArmy
US Flag An Official Website of the United States Government