You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PORTABLE SOLAR POWERED WATER PURIFICATION AND DESALINATION SYSTEM DEVELOPMENT
SBC: Spectra Research, Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency -
LOAD RESPONSIVE HYDROGEN GENERATOR FOR UUV APPLICATION
SBC: Af Sammer Corp. Topic: N/AA PROGRAM FOR THE DEVELOPMENT OF A HYDROGEN GENERATOR FOR USE WITH PEM FUEL CELLS IN UUV APPLICATIONS IS PROPOSED. HYDROGEN IS GENERATED BY REACTING ALKALI AND ALKALIEARTH METAL HYDRIDES WITH WATER. PURE HYDROGEN AND ALKALI-ALKALI EARTH METAL OXIDES OR HYDROXIDES ARE FORMED. ENERGY DENSITIES MAY EXCEED 1KWHR/LB OF REACTANTS. GENERATION IS NOT AFFECTED BY VEHICLE POSITION OR MOTION. THE PROPOSED DE ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
VIRTUAL PROTOTYPING TOOLS FOR SEMICONDUCTOR FABRICATION EQUIPMENT
SBC: CFD RESEARCH CORPORATION Topic: N/ATHE EXISTING METHODOLOGY OF DESIGN AND FABRICATION OF SEMICONDUCTOR MANUFACTURING EQUIPMENT IS AN EXPENSIVE AND TIME CONSUMING PROCESS. TO KEEP PACE WITH THE RAPIDLY ADVANCING SEMICONDUCTOR INDUSTRY, IT IS NECESSARY TO DEVELOP A COMPUTER BASED ENVIRONMENT TO QUICKLY SIMULATE THE FEATURES OF THE MANUFACTURING EQUIPMENT BEFORE IT IS TURNED INTO A PHYSICAL PROTOTYPE. APART FROM ACHIEVING CONSIDERABLE ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
Direct Electroplating Of Interconnects- An Efficient New Technology For Advanced MCMS
SBC: Electrochemical Systems, Inc. Topic: N/AThis proposed development will result in the first production process for direct electroplating of copper interconnects for microelectronics manufacturing. Technology for direct electroplating processes will be developed. The direct electroplating of interconnects with the ECSI proprietary process produces the highest attainable interconnect conductance. The ECSI process does not need the conventi ...
SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency -
Point Of Use Chlorine Gas Generator For Wafer Fabrication
SBC: Electron Transfer Tech Topic: N/AA point of use generator for chlorine gas production is proposed. The generator would provide ultrahigh purity chlorine which is necessary to enhance the growth rate and decrease the impurity level in silicon oxides for silicon device fabrication. The generator will also eliminate the need for environmentally unacceptable organochlorine compounds which are presently used for oxide growth enhanceme ...
SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency -
ULTRA LOW COST ENGINE CONTROL SYSTEM
SBC: Electronic Concepts & Topic: N/APRESENT TURBOJET ENGINE CONTROL SYSTEMS, WHICH ARE COMPRISED OF: CONTROLLER, FUEL METERING DEVICE, SENSORS, CONNECTORS, AND HARNESSES ARE THE SINGLE MOST EXPENSIVE SUBSYSTEM ON EXPENDABLE TURBOJET ENGINES. THE SIZE AND COST OF EXPENDABLE TURBOJET ENGINES HAS STEADILY DECREASED. HOWEVER, THE ENGINE CONTROL SYSTEM COST HAS RE MAINED RELATIVELY CONSTANT. ELECTRONIC CONCEPTS PROPOSES TO DEMONSTRATE TH ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
KNOWLEDGE-BASED SYSTEM INTEROPERABILITY STANDARD
SBC: GMA INDUSTRIES, INC. Topic: N/ATHE PROPOSED EFFORT INVOLVES THE DEVELOPMENT OF A KNOWLEDGE-BASED SYSTEM INTEROPERABILITY STANDARD. ACTIVITIES INVOLVED IN FULFILLING THE TECHNICAL OBJECTIVES INCLUDE THE ANALYSIS AND DEFINITION OF INTERFACES BETWEEN KNOWLEDGED BASED SYSTEMS, DATABASES, ANDAPPLICATION PROGRAMS, AND THE DESIGN AND SPECIFICATION OF A PROTOTYPEDEMONSTRATION SYSTEM FOR THE PURPOSE OF EVALUATING THE RESULTING STANDARD. ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
Fault Tolerant High Speed Network Services
SBC: Intellect Systems Inc. Topic: N/AThe predominant concern of evolving high-speed network architectures is fault tolerance. High-speed networks will expereince a variety of faults, such as link or node failures, excessive buffer overflow due to faulty flow and congestion control mechanisms, and partial failure of the switching fabric. The main goal of this research is to increase the availability of essential network services witho ...
SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency -
HIGH SPEED IMAGE CAPTURE OF THE 3-D PEEL POINT GEOMETRY DURING PAYOUT
SBC: MORGAN RESEARCH CORP. Topic: N/AAN ACCURATE KNOWLEDGE OF THE MAXIMUM FIBER STRESS OCCURRING DURING PAYOUT IS CRITICAL TO IMPROVE THE RELIABILITY OF CURRENT AND FUTURE DISPENSER DESIGNS FOR FIBER OPTIC GUIDED VEHICLES. THE FIBER DEFORMATIONS OCCURRING AT THE PEEL POINT ARE A DIRECT INDICATION OF THE MAXIMUM FIBER STRESSES UNDER NORMAL PAYOUT CONDITIONS. IN ADDITION, THE FIBER DEFORMATIONS AT THE PEEL POINT PROVIDE AN INVALUABLE M ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
Aerospace System Applications Of Micromachine Technologies
SBC: OPTICAL E.T.C., INC. Topic: N/AAerospace systems undergo environmental stressing which ultimately limit their useful life. Empirical rules and constant inspection are required for commercial and military aircraft because real-time data are not known for the high-cost systems. This effort proposes imbedded microelectronic and microelectromechanical devices to constantly monitor aerospace systems and a life-cycle analysis of the ...
SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency