You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA.

    SBC: Advanced Applied Technology            Topic: N/A

    CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA. A VIDEO DISPLAY WITH BORESIGHTED CROSSHAIR IS USED FOR OPERATOR DISPLAY. THIS PROPOSAL IS TO PROVIDE A REAL TIME READOUT OF CALIBRATED BACKGROUND OR TARGET CROSS SECTION ON THE VIDEO DISPLAY TO ENABLE BETTER USE OF FLIGHT TIME. THE READOUT WOULD ALSO BE ...

    SBIR Phase I 1983 Department of DefenseArmy
  2. THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE CONCEPT DE- SIGNED TO PROVIDE FALSE TARGETS INTO THREAT FIRE CONTROL FUSE, DRAW FIRE AND ULTIMATELY SAVE ARMY AIRCRAFT AND IN TURN ENHANCE MISSION SUCESS.

    SBC: Applications Resources Inc            Topic: N/A

    THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE CONCEPT DE- SIGNED TO PROVIDE FALSE TARGETS INTO THREAT FIRE CONTROL FUSE, DRAW FIRE AND ULTIMATELY SAVE ARMY AIRCRAFT AND IN TURN ENHANCE MISSION SUCESS. THIS PHASE I EFFORT IS CONCERNED WITH IDENTIFYING PRELIMINARY FEASABILITY OF THE BASIC CONCEPT ANALYTICALLY, AND TO PERFORM SUFFICIENT ANALYSIS TO ESTABLISH DESIGN REQUIREMENTS FOR A PHSE II MODEL D ...

    SBIR Phase I 1983 Department of DefenseArmy
  3. CLORINE-RESISTANT HOLLOW-FIBER REVERSE-OSMOSIS MEMBRANE ELEMENTS

    SBC: BEND RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  4. THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES.

    SBC: Cas Inc.            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES. THESE PARAMETERS AND WEIGHTING SCHEMES WILL BE ESTABLISHED TO ACHIEVE OPERATIONAL EFFECTIVENESS, AS WELL AS THE DEFINITION, DESIGN, AND CONSTRUCTION PROCESSES AND METHODOLOGIES DEVEL ...

    SBIR Phase I 1983 Department of DefenseArmy
  5. AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE

    SBC: Engineering Analysis Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  6. (BMDATIC) TECHNOLOGY BASE MANAGEMENT INFORMATION SYSTEM

    SBC: ENGINEERING AND SCIENTIFIC RESEARCH ASSO            Topic: N/A

    EER PROPOSES TO CONDUCT A 4 1 MAN MONTH EXPLORATORY DEVELOPMENT EFFORT WHICH WILL FOCUS UPON THE FESIBILITY OF ADAPTING A PREVISOUSLY DEVELOPED MANAGEMENT TOOL WHICH IS CAPABLE OF IDENTIFYING BOTH HIERARCHIAL AND RELATIONAL DATA BASE ATTRIBIUTES. SPECIFICALLY,EER PROPOSES TO ADAPT A REQUIREMENTS DATA BASE TOOL THAT IS CAPABLE OF BEING IDENIFIED IN TERMS OF A MAJOR SYSTEM CONSTRUCTOR IN TERMS OF WR ...

    SBIR Phase I 1983 Department of DefenseArmy
  7. DEVELOPMENT OF LIGTWEIGHT HIGH CAPACITY PORTABLE OXYGEN SYSTEMS FOR BATTLEFIELD MEDICAL SUPPORT

    SBC: GUILD ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  8. NOVEL METHOD OF DENTAL ANESTHIA

    SBC: Hauser Laboratorytories            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  9. REDUCE THE VEE-LOCK JOINT TO ITS MOST COST EFFECTIVE MANUFACTURING METHODS

    SBC: Interlock Design And            Topic: N/A

    THE VALUE OF LIGHTWEIGHT\HIGH STRENGTH TRAIGLAR TRUSS STRUCTURAL MEMBERS ARE RECOGNIZED FOR THERE STRENGTH AND DESIGN EFFICIENCY.MULTIPLE SECTIONS MAY BE JOINED TOGETHER WITHOUT THE USE OF TOOLS USING A VEELOCK JOINT ATTACHED TO THE ENDS OF THE TRUSS. THE VEELOCK JOINT WILL CONNECT TO ITSELF INSTANTLY PROVIDING A LONG SPAN OF TRUSS. QUICK- CONNECT\DISCONNECT VEELOCK TRUSS STRUCTURES WOULD HAVE BRO ...

    SBIR Phase I 1983 Department of DefenseArmy
  10. FLOURELASTOMER COATINGS FOR MATERIALS PROCTECTION IN CHEMICAL WARFARE ENVIRONMENT

    SBC: Lauren Manufacturing Co            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
US Flag An Official Website of the United States Government