You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Synthetic Task Environment for Patient Preparation and Care in an A2/AD Operations

    SBC: ARCHIE MD INC.            Topic: DHA173001

    The ultimate goal of this research is to develop a realistic, immersive 3-D environment for training en route care personnel in primary/secondary assessment, patient stabilization, patient placement, and mission management. EVAC Sim will provide medic rehearsal opportunities for evacuation patient care scenarios. The simulation will help trainees understand resources available in aeromedical aircr ...

    SBIR Phase I 2018 Department of DefenseDefense Health Program
  2. Source Approval for B-52 Wing to Fairing Seal

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: DLA181007

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for a number of NESO items with annual demand values over $10,000 and fewer than two approved sources. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The B- ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Source Approval and Low Rate Production of the Valve Piston (4810-01-269-4808)

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: DLA183006

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) to facilitate NESO in supporting the needs of the U.S. Air Force and U.S. Navy nuclear communities. Mainstream Engineering has carefully reviewed the technical data package for NSN 4810-01-269-4808 provided in the solicitation and is confident that we possess the manufacturing capability, quality manage ...

    SBIR Phase I 2019 Department of DefenseDefense Logistics Agency
  4. Smart Sweat Sensor Patch for Realtime Monitoring

    SBC: TDA Research, Inc.            Topic: DHA18003

    The consequence of physical and mental degraded performance is of critical importance not only to the Department of Defense (DoD) missions and sports persons, but also to the general population as well. Sweat is an information abundant medium that contains biomarkers that show relation to human cognitive levels. However, obtaining days of continuous sampling of sweat from the same dermal spot has ...

    SBIR Phase I 2018 Department of DefenseDefense Health Program
  5. Ruggedized Inertial Measurement Unit System to Assess Movement Dysfunction in Austere Environments

    SBC: APDM, INC.            Topic: DHA191010

    Current balance and gait assessment practices in field environments lack adequate sensitivity to measure subtle but potentially duty-limiting deficits in Service Member (SM) performance. Clinicians endeavor to provide timely, evidence-based assessment of

    SBIR Phase I 2019 Department of DefenseDefense Health Program
  6. Reverse Engineering of MILSTAR Battery Pack

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: DLA182003

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for the MILSTAR system battery assembly. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The MILSTAR nickel-metal hydride battery pack lacks sufficient comme ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  7. Rapid Sourcing for Critical ALRE Items

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: DLA172001

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI). Ten ALRE National Stock Number (NSN) items were identified with annual demand values over $10,000 with two or fewer approved sources.Mainstream Engineering has carefully reviewed the ten NSNs provided ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  8. Quick Magnetic Analgesia Cuff

    SBC: Cornerstone Research Group, Incorporated            Topic: DHA191011

    Cornerstone Research Group Inc. (CRG) proposes to develop an externally wearable, non-invasive, battery-operated device capable of providing analgesia equivalent to pharmacological peripheral ring nerve blocks by manipulating nervous system activity with

    SBIR Phase I 2019 Department of DefenseDefense Health Program
  9. Prototype Application of Mobile, Cloud-based, Watson-Like Technologies for TBI/PTSD Clinical Decision Support and Predictive Analytics

    SBC: Lifecom Inc.            Topic: DHP12005

    The goal of this Phase I project is to develop an engineering plan and to create a prototype for a mobile, cloud-based expert system to aid in diagnosis, decision support and predictive analytics to improve clinical outcomes for veterans, soldiers, and their families with traumatic brain injury (TBI) and posttraumatic stress disorder (PTSD). Lifecom, Inc. is a health information technology compan ...

    SBIR Phase I 2013 Department of DefenseDefense Health Program
  10. Production and Source Approval for NSN 5305-01-417-8566 Socket Cap Screw

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: DLA183009

    The Defense Logistics Agency aims to improve product availability and increase competition on a multitude of NSN items for the Nuclear Enterprise Support Office by introducing capable, small business suppliers through the Source Approval Request (SAR) process. Addition of approved sources for these critical/weapon system items can lead to reduced cost and decreased lead times. Expediting the procu ...

    SBIR Phase I 2019 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government