You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA.
SBC: Advanced Applied Technology Topic: N/ACURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA. A VIDEO DISPLAY WITH BORESIGHTED CROSSHAIR IS USED FOR OPERATOR DISPLAY. THIS PROPOSAL IS TO PROVIDE A REAL TIME READOUT OF CALIBRATED BACKGROUND OR TARGET CROSS SECTION ON THE VIDEO DISPLAY TO ENABLE BETTER USE OF FLIGHT TIME. THE READOUT WOULD ALSO BE ...
SBIR Phase I 1983 Department of DefenseArmy -
TRANSILLUMINATION OF DENTAL STRUCTURES AND GINGIVAE BY VISIBLE WAVE-LENGTH LASER LIGHT DIAGNOSE DENTAL AND PARA- ORAL CAVITY ABNORMALTIES IS PROPOSED.
SBC: Alm Inc. Topic: N/ATRANSILLUMINATION OF DENTAL STRUCTURES AND GINGIVAE BY VISIBLE WAVE-LENGTH LASER LIGHT DIAGNOSE DENTAL AND PARA- ORAL CAVITY ABNORMALTIES IS PROPOSED. IN ADDITION, LASER SPECTROSCOPY OF RELATED DENTAL STRUCTURES AND TISSUE SHALL BE PERFORMED TO DETERMINE THE LASER WAVE-LENTHS BEST SUIT TOIDENTIFICATION OF A WIDE RANGE OF DENTAL FEATURES. ALSO, LASER POWER VS. WAVELENGTH WILL BE DETERMINED FOR EFFE ...
SBIR Phase I 1983 Department of DefenseArmy -
THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE CONCEPT DE- SIGNED TO PROVIDE FALSE TARGETS INTO THREAT FIRE CONTROL FUSE, DRAW FIRE AND ULTIMATELY SAVE ARMY AIRCRAFT AND IN TURN ENHANCE MISSION SUCESS.
SBC: Applications Resources Inc Topic: N/ATHE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE CONCEPT DE- SIGNED TO PROVIDE FALSE TARGETS INTO THREAT FIRE CONTROL FUSE, DRAW FIRE AND ULTIMATELY SAVE ARMY AIRCRAFT AND IN TURN ENHANCE MISSION SUCESS. THIS PHASE I EFFORT IS CONCERNED WITH IDENTIFYING PRELIMINARY FEASABILITY OF THE BASIC CONCEPT ANALYTICALLY, AND TO PERFORM SUFFICIENT ANALYSIS TO ESTABLISH DESIGN REQUIREMENTS FOR A PHSE II MODEL D ...
SBIR Phase I 1983 Department of DefenseArmy -
BROADBAND TRANSMITTING ANTENNA
SBC: ASTRON WIRELESS TECHNOLIGIES, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
CLORINE-RESISTANT HOLLOW-FIBER REVERSE-OSMOSIS MEMBRANE ELEMENTS
SBC: BEND RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES.
SBC: Cas Inc. Topic: N/ATHE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES. THESE PARAMETERS AND WEIGHTING SCHEMES WILL BE ESTABLISHED TO ACHIEVE OPERATIONAL EFFECTIVENESS, AS WELL AS THE DEFINITION, DESIGN, AND CONSTRUCTION PROCESSES AND METHODOLOGIES DEVEL ...
SBIR Phase I 1983 Department of DefenseArmy -
SOLDIER-MACHINE INTERFACE
SBC: Decision Science Associates Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
COMBAT VEHICLES
SBC: Dynacom Company Topic: N/AA VARIETY OF ELECTRICAL/HYDRAULIC MOTORS, PUMPS, FANS, AND BLOWERS EMPLOYED WITHIN COMBAT VEHICLES IMPOSE UNACCEPTABLE NOISE LEVELS ON CREW MEMBERS. THIS INVESTIGATION ADDRESSES DEVELOPMENT AND EVALUATION OF A PROTOTYPE NOISE REDUCTION PROCESSOR SUITABLE FOR LATER IMPLEMENTATION WITHIN A SELF- CONTAINED HEADSET. COMMUNICATIONS BETWEEN CREW MEMBERS WOULDBE ACOUSTICALLY COUPLED WITH NOISE REDUCTION ...
SBIR Phase I 1983 Department of DefenseArmy -
AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE
SBC: Engineering Analysis Inc Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
(BMDATIC) TECHNOLOGY BASE MANAGEMENT INFORMATION SYSTEM
SBC: ENGINEERING AND SCIENTIFIC RESEARCH ASSO Topic: N/AEER PROPOSES TO CONDUCT A 4 1 MAN MONTH EXPLORATORY DEVELOPMENT EFFORT WHICH WILL FOCUS UPON THE FESIBILITY OF ADAPTING A PREVISOUSLY DEVELOPED MANAGEMENT TOOL WHICH IS CAPABLE OF IDENTIFYING BOTH HIERARCHIAL AND RELATIONAL DATA BASE ATTRIBIUTES. SPECIFICALLY,EER PROPOSES TO ADAPT A REQUIREMENTS DATA BASE TOOL THAT IS CAPABLE OF BEING IDENIFIED IN TERMS OF A MAJOR SYSTEM CONSTRUCTOR IN TERMS OF WR ...
SBIR Phase I 1983 Department of DefenseArmy