You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Antenna design by genetic algorithms

    SBC: EMAG TECHNOLOGIES, INC.            Topic: N08T031

    The overall objective of this STTR project is to develop a comprehensive CAD environment for design and optimization of antennas and arrays on complex platforms such as topsides of naval surface combatants. EMAG Technologies Inc. has teamed up with the University of Michigan to develop a novel solution for placement of antennas on such platforms using a number of new physics-based genetic algorith ...

    STTR Phase II 2010 Department of DefenseNavy
  2. ARCHIMEDES

    SBC: SOAR TECHNOLOGY INC            Topic: N17AT004

    Evidence-based guidelines derived from the learning sciences literature can be applied to training-requirements decisions. However, accessing the state-of-the-art in the learning sciences and applying its lessons to specific training design and analysis questions can be difficult, especially for those not already familiar with the learning sciences. ARCHIMEDES, the software tool proposed in this e ...

    STTR Phase II 2019 Department of DefenseNavy
  3. Automated Human and System Performance Assessment in Operational Environments

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: N11AT001

    Our Fused-Realities-Assessments-Modules(FRAM) enables innovative new levels and types of automated quantification strategies for combining human and system performance in real-time for fused performance monitoring and after-action-review purposes. FRAM accomplishes this by fusing output of normative models of behaviors (cognitive/procedural/team), human states (physiological/affective), system sta ...

    STTR Phase II 2013 Department of DefenseNavy
  4. Compact, Light Weight, Low Cost, Precision, Non-inertial Underwater Navigation Sensor

    SBC: ANALYSIS DESIGN & DIAGNOSTICS INC            Topic: N11AT027

    TBD

    STTR Phase II 2013 Department of DefenseNavy
  5. Cyber Ready-and-Aware Mindset for Protection and Resilience against Threats (Cyber RAMPART)

    SBC: SOAR TECHNOLOGY INC            Topic: N17AT023

    We propose to develop Cyber RAMPART as an extensible and customizable training delivery tool with near-term transition potential. It will offer shipboard operations personnel the opportunity to develop foundational cyber awareness knowledge and skill that prepares them to participate in their ship’s cyber defense mission and to hit the ground running in future fleet-level exercises that include ...

    STTR Phase II 2018 Department of DefenseNavy
  6. Dynamic virtual moulage based on thin film adhesive displays

    SBC: ARCHIE MD INC.            Topic: DHA17A002

    Providing Army combat medics with meaningful experience in treatment of battlefield injuries is a particular challenge. Moulage has the potential to assist in acquiring what could otherwise be very hard-to-come-by preparatory experience for distressing real-life emergencies medics and soldiers may encounter in the field. However, current approaches to moulage are limited in their ability to reflec ...

    STTR Phase II 2018 Department of DefenseDefense Health Agency
  7. Epitaxial Technologies for Gallium Oxide Ultra High Voltage Power Electronics

    SBC: AGNITRON TECHNOLOGY, INC.            Topic: N16AT023

    xß-Ga2O3 has emerged as a potentially disruptive semiconductor with a predicted breakdown field of ~8 MV/cm which is more than twice the breakdown field for the incumbent wide bandgap semiconductors GaN and SiC. The availability of ß-Ga2O3 bulk substrates sets this material apart from other wide bandgap materials for power electronic applications. However, the challenge is to find suitable epita ...

    STTR Phase II 2018 Department of DefenseNavy
  8. Fully Encapsulating Dielectrics for Gaseous Helium Cooled Superconducting Power Cables

    SBC: ADVANCED CONDUCTOR TECHNOLOGIES LLC            Topic: N16AT011

    The proposed program will develop dielectrics for dc superconducting power transmission cables that are cooled with cryogenic helium gas. The Dielectrics will be sealed again helium gas penetration and allow for an operating voltage of 12 kV in a pressure of 2 MPa at 50 K. The dielectrics will be designed for use with all helium facing components of power transmission systems based on CORC cables. ...

    STTR Phase II 2018 Department of DefenseNavy
  9. Guided Realistic Individualized Practice (GRIP)

    SBC: SOAR TECHNOLOGY INC            Topic: N09T028

    The US Navy is undertaking a Total Force Transformation to develop a more agile, deployable, and capable force to meet the challenges of 21st century conflicts. The adaptive expertise required by the Total Force demands innovative and evidence-based approaches to instruction, training, and assessment that enable the development of both routine and adaptive skills. Given the costs of developing tra ...

    STTR Phase II 2010 Department of DefenseNavy
  10. High-level tools and languages for faster Intelligent Tutoring System(ITS) model development

    SBC: SOAR TECHNOLOGY INC            Topic: N11AT032

    Intelligent tutoring systems (ITSs) hold the promise of dramatically decreasing the cost of training while also providing consistent, formalized instruction with automated trainee-assessment tools. However, the adoption of ITSs has been limited because: (1) most ITS systems are developed for specific, well defined, domains and cannot be easily adapted; and (2) they are time consuming and expensive ...

    STTR Phase II 2013 Department of DefenseNavy
US Flag An Official Website of the United States Government