You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA.

    SBC: Advanced Applied Technology            Topic: N/A

    CURRENT TESTING OF MILLIMETER WAVE SEEKERS AND DATA ACQUISTION INVOLVE EXTENSIVE FLIGHT TESTING WITH VIDEO AND MAGNETIC TAPE USED TO RECORD DATA. A VIDEO DISPLAY WITH BORESIGHTED CROSSHAIR IS USED FOR OPERATOR DISPLAY. THIS PROPOSAL IS TO PROVIDE A REAL TIME READOUT OF CALIBRATED BACKGROUND OR TARGET CROSS SECTION ON THE VIDEO DISPLAY TO ENABLE BETTER USE OF FLIGHT TIME. THE READOUT WOULD ALSO BE ...

    SBIR Phase I 1983 Department of DefenseArmy
  2. THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE CONCEPT DE- SIGNED TO PROVIDE FALSE TARGETS INTO THREAT FIRE CONTROL FUSE, DRAW FIRE AND ULTIMATELY SAVE ARMY AIRCRAFT AND IN TURN ENHANCE MISSION SUCESS.

    SBC: Applications Resources Inc            Topic: N/A

    THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE CONCEPT DE- SIGNED TO PROVIDE FALSE TARGETS INTO THREAT FIRE CONTROL FUSE, DRAW FIRE AND ULTIMATELY SAVE ARMY AIRCRAFT AND IN TURN ENHANCE MISSION SUCESS. THIS PHASE I EFFORT IS CONCERNED WITH IDENTIFYING PRELIMINARY FEASABILITY OF THE BASIC CONCEPT ANALYTICALLY, AND TO PERFORM SUFFICIENT ANALYSIS TO ESTABLISH DESIGN REQUIREMENTS FOR A PHSE II MODEL D ...

    SBIR Phase I 1983 Department of DefenseArmy
  3. CLORINE-RESISTANT HOLLOW-FIBER REVERSE-OSMOSIS MEMBRANE ELEMENTS

    SBC: BEND RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  4. THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES.

    SBC: Cas Inc.            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PAYOFF MEASURMENT PARAMETERS AND ATTENDANT WEIGHTING VALUES/ RANGES FOR DISTRIBUTE DATA PROCESSING SYSTEMS FOR VARIOUS BALLISTIC MISSILE DEFENSE (BMD) SYSTEM ARCHITECTURES. THESE PARAMETERS AND WEIGHTING SCHEMES WILL BE ESTABLISHED TO ACHIEVE OPERATIONAL EFFECTIVENESS, AS WELL AS THE DEFINITION, DESIGN, AND CONSTRUCTION PROCESSES AND METHODOLOGIES DEVEL ...

    SBIR Phase I 1983 Department of DefenseArmy
  5. THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE THE DESIGNER OF AN TI-RADIATION HOMING MISSILES WITH THE INFORMATION NECESSARY TO STRUCTURE FUTURE STUDIES AND TECHNOLOGY PROGRAMS AIMED AT DEVELOPING AN ANTI- RADIATION MISSILE CAPABLE OF HOMING ON

    SBC: Cas Inc.            Topic: N/A

    THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO PROVIDE THE DESIGNER OF AN TI-RADIATION HOMING MISSILES WITH THE INFORMATION NECESSARY TO STRUCTURE FUTURE STUDIES AND TECHNOLOGY PROGRAMS AIMED AT DEVELOPING AN ANTI- RADIATION MISSILE CAPABLE OF HOMING ON THREAT RADIATION MISSILE CAPABLE OF HOMING THREAT RADARS UTILIZING SPREAD SPECTRUM TECHNIQUES. THIS INVOLVES THE FOLLOWING TWO TASKS: 1. DEFINE THE C ...

    SBIR Phase I 1983 Department of DefenseAir Force
  6. INVESTIGATION OF FUNCTIONAL PROGRAMMING IN DEFENSE APPLICATIONS

    SBC: Computer Technology Associates            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  7. THE DESIGN OF A RAPID, INTELLIGENT PROTOTYPING LANQUAGE (RIPL)

    SBC: Computer Technology Associates            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  8. HEAD-UP DISPLAY

    SBC: Crew Systems Consultants            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  9. LOGICAL CLEANSING

    SBC: Electronic Design & Research            Topic: N/A

    A NEW TYPE NOISE REDUCTION TECHNIQUE (1) HAS OPENED THE OPPORTUNITY TO DETECT BOTH A SIGNAL WITH NEGATIVE SIGNAL TO NOISE RATIO AND RANDOM SIGNAL ON A LINE. THE IMPORTANT ADVANTAGE OF THIS TECHNIQUE OVER EXTERNAL ENVIRONMENT NOISE AS WELL AS AN INTERNAL BACKROUND NOISE. IT PROVIDES A REAL TIME DETECTION AT A WIDE FREQUENCY RANGE, THIS VERY EFFICENT AND INEXPENSIVE APPROACH TO IMPROVE THE SNR BY TH ...

    SBIR Phase I 1983 Department of DefenseArmy
  10. AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE AUDIO-VISUAL DEBUG METHOD FOR COMPUTER SOFTWARE

    SBC: Engineering Analysis Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
US Flag An Official Website of the United States Government