You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Acute-infarct selective cardiac MRI contrast agent

    SBC: ELGAVISH PARAMAGNETICS, INC.            Topic: NHLBI

    DESCRIPTION provided by applicant The overall goal of this project is to demonstrate the ability of our acute myocardial infarct selective paramagnetic contrast agent Gadolinium ABE DTTA to differentiate between acute and chronic infarcts in a reliable manner using contrast enhanced magnetic resonance imaging ceMRI In our Phase I data we have shown that Gd ABE DTTA exclusively highlight ...

    STTR Phase II 2010 Department of Health and Human ServicesNational Institutes of Health
  2. Integration of Risk Analysis into Acquisition Cost, Schedule, and Performance Evaluation Tools

    SBC: EDAPTIVE COMPUTING INC            Topic: AF06202

    A critical capability required by the DoD is maintaining an accurate and comprehensive picture of the battlespace at all times. A key to this is the growing use of layered sensor networks that together form complex systems-of-systems. Utilizing this approach for effective situational awareness requires high level of trust in the data that is ultimately produced. Critical to this goal is ensurin ...

    SBIR Phase II 2010 Department of DefenseAir Force
  3. Panel Step/Gap Mismatch Measurement

    SBC: TeraMetrix, LLC            Topic: AF082C001

    In phase II we will develop a prototype TD-THz step/gap mismatch measurement system. This system will be able to measure the sub-surface ground-plane step and gap dimensions on the seams of panels on the F-35 aircraft. In phase I, we demonstrated the ability of the TD-THz method to measure the dimensions of the ground-plane step and gap through otherwise opaque boots and coatings. The first app ...

    SBIR Phase II 2010 Department of DefenseAir Force
  4. Lithium Niobate Optical Modulator for Microwave Filtering Applications

    SBC: SRICO INC            Topic: SB082039

    This Small Business Innovation Research Phase II project develops novel materials processing and device design that extract the maximum possible performance out of the lithium niobate electro-optic material. The novel modulator device incorporates reconfigurable quasi-phase matching (RQPM) to produce an arbitrary RF bandpass response. The Phase I effort has laid a firm foundation for the creation ...

    SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  5. Advanced weapon sighting systems fabricated with FemtoWrite and FemtoEtch processes

    SBC: TRANSLUME INC            Topic: A09030

    The Army has a need for better weapon sight reticles. Currently, weapon sight reticles are fabricated only on flat glass surfaces. These flat surfaces produce unwanted retro-reflections. During Phase I Translume demonstrated a femtosecond-laser based process to fabricate subsurface reticles in the bulk of flat or curved glass substrates. Subsurface reticles have much lower retroreflection than ...

    SBIR Phase II 2010 Department of DefenseArmy
  6. Advanced Architecture and Process Techniques for High-Density, Radiation-Hardened Non-Volatile Memory

    SBC: Amtec Corporation            Topic: MDA08023

    For mission critical data storage on systems operating in natural space and nuclear weapons environments, the use of radiation hardened (RH) non-volatile memory (NVM) is imperative. Today’s complex computer controlled electronic systems use NVM to store critical data for proper operation. This typically includes configuration parameters which allow the system to return to a known configuration ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  7. Tiger Board

    SBC: SOAR TECHNOLOGY INC            Topic: A09018

    There is a growing interest in employing modeling and simulation technology as a low-cost substitute to live Air-Traffic Control (ATC) exercises. One popular approach is to replace human role-players with computer-generated forces (CGFs). Here, the trainer must encode the behaviors of CGFs participating in each exercise. This task requires modeling expertise, which the trainer likely lacks, and fa ...

    SBIR Phase II 2010 Department of DefenseArmy
  8. Airworthy Cable Angle Measurement System For Slung Load Operations

    SBC: Advanced Optical Systems, Inc            Topic: A09013

    Advanced Optical Systems, Inc. (AOS) has developed and demonstrated the Cable Angle Measurement System, a low-cost, accurate system for measuring a helicopter’s load position and motion at the end of an external sling. By using a camera, an LED target, and custom electronics, the AOS system measures the load’s angle with better than 0.1° accuracy across a 150° field of view and with 0.1°/s ...

    SBIR Phase II 2010 Department of DefenseArmy
  9. NetSafe Version 2- Field-testing, Enhancment and Integration of the NetSafe Version 1 Software at the Ft. Drum Army Facility Resulting in a Robust Po

    SBC: GLOBAL QUALITY CORP.            Topic: A08171

    The Phase II R&D will create a set of water distribution system monitoring and modeling software components (NetSafe V2) that can be used to create a new contaminant warning system (CWS) or to augment an existing one. These components will be field-tested at the US Army Ft. Drum facility, and will be integrated into existing SCADA and GIS. The feasibility of the innovative approaches behind these ...

    SBIR Phase II 2010 Department of DefenseArmy
  10. Pilot Physiologic Assessment System (PPAS)

    SBC: ORBITAL RESEARCH INC            Topic: N091018

    Orbital Research Inc in collaboration with NASA Glenn Research Center (NASA GRC), Kent State University (KSU) and Massachusetts Institute of Technology (MIT) will design and test the second generation, Pilot Physiologic Assessment System (PPAS-2) as part of the Phase I option and Phase II SBIR program funded by the U.S. Navy. The system will be a comprehensive bio-monitoring suite that acquires ph ...

    SBIR Phase II 2010 Department of DefenseNavy
US Flag An Official Website of the United States Government