You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WEIGHT, COMPACT SOLAR WATER DISTILLATION PURIFICATION DEVICE

    SBC: Abel Company            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  2. ADVANCED UNDERSEA TACTICAL COMMUNICATIONS TECHNIQUES

    SBC: Defense Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  3. PORTABLE SOLAR POWERED WATER PURIFICATION AND DESALINATION SYSTEM DEVELOPMENT

    SBC: Spectra Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  4. Voice Authentication Monitoring System

    SBC: Advanced Processing Tech.,            Topic: N/A

    Speech deception and voice "hijacking" techniques are now sophisticated beyond the ability of any single detection methodology. Deceptive speech detection requires an array of analysis tools to collectively provide an acceptable probability of detection. An effective Voice Authentication Monitoring System is envisioned as a "work bench" tool set to detect, analyze and assess speech deception. Deve ...

    SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency
  5. VIRTUAL PROTOTYPING TOOLS FOR SEMICONDUCTOR FABRICATION EQUIPMENT

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    THE EXISTING METHODOLOGY OF DESIGN AND FABRICATION OF SEMICONDUCTOR MANUFACTURING EQUIPMENT IS AN EXPENSIVE AND TIME CONSUMING PROCESS. TO KEEP PACE WITH THE RAPIDLY ADVANCING SEMICONDUCTOR INDUSTRY, IT IS NECESSARY TO DEVELOP A COMPUTER BASED ENVIRONMENT TO QUICKLY SIMULATE THE FEATURES OF THE MANUFACTURING EQUIPMENT BEFORE IT IS TURNED INTO A PHYSICAL PROTOTYPE. APART FROM ACHIEVING CONSIDERABLE ...

    SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency
  6. Software reusability

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency
  7. ULTRA LOW COST ENGINE CONTROL SYSTEM

    SBC: Electronic Concepts &            Topic: N/A

    PRESENT TURBOJET ENGINE CONTROL SYSTEMS, WHICH ARE COMPRISED OF: CONTROLLER, FUEL METERING DEVICE, SENSORS, CONNECTORS, AND HARNESSES ARE THE SINGLE MOST EXPENSIVE SUBSYSTEM ON EXPENDABLE TURBOJET ENGINES. THE SIZE AND COST OF EXPENDABLE TURBOJET ENGINES HAS STEADILY DECREASED. HOWEVER, THE ENGINE CONTROL SYSTEM COST HAS RE MAINED RELATIVELY CONSTANT. ELECTRONIC CONCEPTS PROPOSES TO DEMONSTRATE TH ...

    SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency
  8. SEISMIC DISCRIMINANTS IN EURASIA

    SBC: ENSCO Inc            Topic: N/A

    THIS PROPOSED PHASE I RESEARCH PROJECT PROVIDES A UNIQUE OPPORTUNITY TO REVIEW REGIONAL SEISMIC DISCRIMINANTS, DEVELOPA STATISTICAL METHOD FOR IDENTIFYING EVENTS, DEVELOP QUALITY CONTROL PROCEDURES FOR ALLOWING FOR EFFECTS OF NOISE AND REGIONAL PROPAGATION EFFECTS ON DISCRIMINANTS, AND TO STATISTICALLY ANALYZE THE DISCRIMINATION CAPABILITY OF THESE REGIONAL DISCRIMINANTS. THE LARGE DATABASE OFREGI ...

    SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency
  9. OPTICAL FIBER SENSOR-BASED SMART MATERIALS AND STRUCTURES

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    SMART MATERIALS OFFER EXCITING OPPORTUNITIES FOR THE IMPLEMENTATION OF ADAPTIVE STRUCTURES. SMART MATERIALS ARE A NEW CLASS OF MATERIALS, WHICH CONTAIN THEIR OWN INTERNAL SENSOR, ACTUATOR AND SIGNAL PROCESSING, ELEMENTS. THESE STRUCTURALLY AND FUNCTIONALLY INTEGRATED ELEMENTS GIVE THE MATERIAL THE CAPABILITY TO DETECT CHANGES IN ITS ENVIROMENT, CHANGE ITS STRUCTURAL, ELECTROMAGNETIC AND/OR CHEMICA ...

    SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency
  10. Fault Tolerant High Speed Network Services

    SBC: Intellect Systems Inc.            Topic: N/A

    The predominant concern of evolving high-speed network architectures is fault tolerance. High-speed networks will expereince a variety of faults, such as link or node failures, excessive buffer overflow due to faulty flow and congestion control mechanisms, and partial failure of the switching fabric. The main goal of this research is to increase the availability of essential network services witho ...

    SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government