You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Biomechanical-Physiological Model for Preclinical Investigation of Blast Wave TBI

    SBC: CFD RESEARCH CORPORATION            Topic: OSD08H14

    In Operation Iraqi Freedom (OIF) 61% of soldiers injured in explosion blast events experienced Traumatic Brain Injury (TBI). The current incomplete understanding of TBI mechanisms limits the development of protection and therapeutic measures. Animal testing, in vitro study, and analysis of clinical data, while useful and necessary, are slow, expensive, and often inconclusive. Anatomy and physiolog ...

    SBIR Phase II 2010 Department of DefenseArmy
  2. A Biomechanical-Physiological Model for Preclinical Investigation of Blast Wave TBI

    SBC: CFD RESEARCH CORPORATION            Topic: OSD08H14

    In Operation Iraqi Freedom (OIF) 61% of soldiers injured in explosion blast events experienced Traumatic Brain Injury (TBI). The current incomplete understanding of TBI mechanisms limits the development of protection and therapeutic measures. Animal testing, in vitro study, and analysis of clinical data, while useful and necessary, are slow, expensive, and often inconclusive. Anatomy and physiolog ...

    SBIR Phase II 2010 Department of DefenseArmy
  3. Accelerated Reconnaissance Window Development

    SBC: UES INC            Topic: AF093129

    In this Phase I SBIR program UES will develop an economic fabrication process to produce high optical quality infrared (IR) windows for reconnaissance window applications. The state-of-the art reconnaissance window are lacking in optical quality and/or durability to withstand operational environments for extended periods of time. Also, the availability of such advanced window materials in large si ...

    SBIR Phase I 2010 Department of DefenseAir Force
  4. AC Impedance Sensor for Collective Protection Filter Residual Life Indicator

    SBC: GUILD ASSOCIATES INC            Topic: CBD10106

    Guild Associates, Inc. proposes to develop and evaluate an active electrochemical sensor based residual life indicator (RLI) for adsorptive carbon filters. The sensing system of the RLI will operate by analyzing the electrochemical state of the carbon within the filter and evaluate the remaining adsorptive reactive capacities of the filter. The sensor design will be challenged against an array of ...

    SBIR Phase I 2010 Department of DefenseOffice for Chemical and Biological Defense
  5. A Cognitive Systems Approach to Supporting Air Force Intelligence Analysis

    SBC: 361 INTERACTIVE LLC            Topic: AF093031

    United States intelligence analysts of today and tomorrow are faced with a paramount challenge of maintaining situation awareness in the midst of an ever-growing and changing capacity of available data. As the incoming data streams continue to expand, so do the expectations and requests placed on the analysts. Layered Sensing offers a promising solution to meeting the Intelligence, Reconnaissance ...

    SBIR Phase I 2010 Department of DefenseAir Force
  6. A Comprehensive Approach for Design Complexity Analysis of Avionics Software

    SBC: Optimization Technology, Inc.            Topic: N/A

    Due to the fairly recent acceptance of software metrics collection techniques, comparative measures of software attributes such as complexity, usability, and quality are not being used for the evaluation of end-product source code. Unfortunately, the problems found are often due to an overly complex or faulty design specification requiring a post-implementation redesign phase. OTI proposes to shor ...

    SBIR Phase I 1993 Department of DefenseAir Force
  7. A Comprehensive CFD Tool for Aerothermal Environment Around Space Vehicles

    SBC: CFD RESEARCH CORPORATION            Topic: A206

    The goal of this SBIR project is to develop an innovative, high fidelity computational tool for accurate prediction of aerothermal environment around space vehicles. This tool will be based on the Unified Flow Solver (UFS) developed at CFDRC for hybrid simulations of rarefied, transitional and continuum flows. In this project, UFS will be enhanced to include: radiation transport, non-equilibrium c ...

    SBIR Phase II 2010 National Aeronautics and Space Administration
  8. Acoustic Interactions with Spray Combustion in Liquid Propellant Rocket Thrust Chambers

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  9. Active coatings for Disseminating Bi-Spectral Obscurant Materials

    SBC: POWDERMET INC            Topic: A10027

    In this program Powdermet will combine controlled particle packing theory, particle interface control through particle coating and improve particle aeration by combining energetic gas formers within the obscurant compact. The end result of the program will be a device that outperforms current burster canisters with existing available obscurant materials and also can be applied to newly developed ...

    SBIR Phase I 2010 Department of DefenseArmy
  10. ACTIVE NOISE AND VIBRATION CONTROL FOR AUXILIARY PCWER UNITS

    SBC: Centrair Corp            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING CLASS 28 IO KW (12.5 EVA) AND 30 KW (37.5 KVA) AUXILIARY POWER UNITS THAT ARE LIGHTER THAN PRESENT M D INVENTORY WITH 120 VOLT A.C. - 3% AT 60 HZ AT A .8 POWER FACTOR THAT HAVE MAXIMUM NOISE LEVELS OF 7SDB (A) AT ONE METER OUTSIDE OF THE SHELTER AND SSDB (A) INSIDE THE HUMAN FACTORS COMPARTMENT. VIBRATIONAL OSCILLATION IS ...

    SBIR Phase II 1993 Department of DefenseArmy
US Flag An Official Website of the United States Government