You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Reverse Engineering and Source Development for F107 Replacement Components
SBC: MAINSTREAM ENGINEERING CORP Topic: DLA181007The Defense Logistics Agency (DLA) is seeking small businesses capable of manufacturing and supplying an assortment of replacement components for the F107 turbofan engine. The F107 is most commonly used as the propulsion system for cruise missiles. Given the F107’s primary use, maintaining a supply chain capable of keeping the engine in operation is paramount. DLA has stated that the F107 engine ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Advanced Manufacturing Technologies
SBC: ONTO TECHNOLOGY, LLC Topic: DLA152001This Phase II Small Business Innovation Research project develops the scale of lithium-ion direct recycling technologies applied to gain efficiencies in materials management from original manufacturing to end-of-life. The scrap materials are from Defense Logistics Agency manufacturing activities. A successful effort moves direct recycle TRL from 4 to 6, increases process throughput, qualifies mate ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Additive Manufacturing Process Monitoring and Control Technologies
SBC: ARCTOS Technology Solutions, LLC Topic: DLA181002This SBIR will demonstrate coaxial thermal imaging using the Stratonics ThermaViz® sensor as a uniquely effective tool for tracking process metrics, at high-speed, during laser powder bed fusion (LPBF). The Phase II project will then develop this sensing technique for LPBF process qualification and closed-loop control. The key is integrating ThermaViz into UTC’s AMSENSE® in situ monitoring arc ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Additive Manufacturing Process Monitoring and Control Technologies
SBC: Made In Space, Inc. Topic: DLA181002Made In Space, Inc. (MIS) proposes an Aulë Filament Inspection System (AFIS) to provide filament quality control capability for additive manufacturing (AM). AFIS enables the Defense Logistics Agency (DLA) to confidently support AM efforts both internal to DLA and throughout its customer base such as the Marine Corp Advanced Manufacturing Operations Cell. To create the product quality line system, ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Additive Manufacturing Sensor Fusion Technologies for Process Monitoring and Control.
SBC: ARCTOS Technology Solutions, LLC Topic: DLA18A001This Phase II project aims to assemble the key set of sensor modalities that are needed to reliably view the key process anomalies and properties of laser powder bed fusion. The research team will down-select from the Phase I sensors investigated and integrate the sensors into a sensor fusion software package that facilitates data collection and synchronization, and eventually feedback control of ...
STTR Phase II 2019 Department of DefenseDefense Logistics Agency -
SGSI and FLOLS Lens Development and Source Approval
SBC: MAINSTREAM ENGINEERING CORP Topic: DLA172001In Phase II, Mainstream will continue development efforts for several lenses used in the stabilized glide slope indicator (SGSI) system and Fresnel lens optical landing system (FLOLS). Mainstream produced prototype clear acrylic lenticular lenses prototypes that passed optical tests performed by the engineering support activity (ESA) at NAWCADLKE in Phase I. Mainstream will develop conformal color ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Source Approval for Hard-to-Source Items
SBC: MAINSTREAM ENGINEERING CORP Topic: DLA172002Additional sources of supply are desired by the Defense Logistics Agency for Land and Maritime hard-to-source items, as well as critical application and safety items (CAI/CSI) for Aircraft Launch and Recovery Equipment (ALRE). Mainstream has carefully reviewed the requirements provided in the technical data packages for several NSNs and determined that they fit within our manufacturing capabilitie ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Laser-Aided Automated Removal of Anti-Reflective Coatings From Germanium Substrates
SBC: ADA TECHNOLOGIES, INC. Topic: DLA183015High-purity germanium (Ge) is manufactured into infrared (IR) lenses for most DoD night sight IR optics, thermal imaging systems, and IR tracking systems in combat vehicles. A recent report by Umicore (ADA’s partner for this proposed project) identifies several current and future needs for Ge, showing growing needs in the middle of severe shortfall. These applications are essential for tracking ...
SBIR Phase I 2019 Department of DefenseDefense Logistics Agency -
Production and Source Approval for NSN 5305-01-417-8566 Socket Cap Screw
SBC: MAINSTREAM ENGINEERING CORP Topic: DLA183009The Defense Logistics Agency aims to improve product availability and increase competition on a multitude of NSN items for the Nuclear Enterprise Support Office by introducing capable, small business suppliers through the Source Approval Request (SAR) process. Addition of approved sources for these critical/weapon system items can lead to reduced cost and decreased lead times. Expediting the procu ...
SBIR Phase I 2019 Department of DefenseDefense Logistics Agency -
Production and Source Approval for NSN 5305-01-661-8323 Shoulder Screw
SBC: MAINSTREAM ENGINEERING CORP Topic: DLA183010The Defense Logistics Agency aims to improve product availability and increase competition on a multitude of NSN items for the Nuclear Enterprise Support Office by introducing capable, small business suppliers through the Source Approval Request process. Addition of approved sources for these critical/weapon system items can lead to reduced cost and decreased lead times. Expediting the procurement ...
SBIR Phase I 2019 Department of DefenseDefense Logistics Agency