You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  2. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  4. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Designing a mini-pilot scale unit for extraction and electrospinning of chitin as an adsorbent for uranium from seawater

    SBC: 525 Solutions, Inc.            Topic: 19g

    With the 4 billion tons of uranium estimated to be dissolved in the earth & apos;s oceans, an essentially unlimited resource is available to those with easy and affordable access. With decades of research towards the extraction of uranium from seawater, focus has been directed towards the selectivity of the adsorbent material, the cost of the material, and the ability of the adsorbent to be recycl ...

    SBIR Phase I 2013 Department of Energy
  6. GPU-Accelerated Multiphase Eulerian-Lagrangian Solver with Adaptive Mesh Refinement

    SBC: CFD RESEARCH CORPORATION            Topic: 14c

    Computer simulations of multi-phase flows are important for many applications. In the proposed work, we plan to advance Eulerian-Lagrangian methods by using Adaptive Mesh Refinement for multi-scale resolutions, and CPU-GPU parallelization to drastically reduce computing time. Eulerian-Lagrangian methods treat the gas/liquid phase as a continuum (Eulerian) fluid, and solid particulates as discrete ...

    SBIR Phase I 2013 Department of Energy
  7. Real-Time 3-D Volume Imaging and Mass-Gauging of High Temperature Flows and Power System Components in a Fossil Fuel Reactor Using Electrical Capacitance Volume Tomography

    SBC: TECH4IMAGING LLC            Topic: 14d

    Controlling emissions and increasing efficiencies are essential requirements in future advanced power plants. Herein, next generation power systems require greater flexibility in their operations for meeting the higher efficiency and lower emissions conditions that are geared toward meeting consumer demand and adhering to increased regulatory standards, simultaneously. Those requirements can be me ...

    SBIR Phase I 2013 Department of Energy
  8. Adoption of High Performance Computational (HPC) Modeling Software for Widespread Use in the Manufacture of Welded Structures

    SBC: Engineering Mechanics Corporation of Columbus            Topic: 02a

    The use of virtual design in the fabrication of large structures has enjoyed significant success in the heavy materials industry for almost two decades. Industries that have used virtual design and analysis tools have reduced material parts size, developed environmentally-friendly fabrication processes, improved product quality and performance, and reduced manufacturing costs. The proposed projec ...

    SBIR Phase I 2013 Department of Energy
  9. Power Tunable High and Narrowband THz source for THz Pump X-ray Probe Experiments

    SBC: EUCLID TECHLABS, LLC            Topic: 04b

    Most time resolved studies to date have made use of readily available visible and near-visible pump sources to trigger the events and, thus were able to study only a small subset of phenomena. Recently, investigations of the dynamics stimulated by THz pulses have led to advances like the selective control of an insulator metal transition, discovery of light induced superconductivit ...

    SBIR Phase I 2013 Department of Energy
  10. Metal Plasmonic Nanostructures Functionalized by Atomic Layer Deposition of 2A Metal-Oxides for Robust High-Quantum-Efficiency Ultrafast Photocathodes

    SBC: EUCLID TECHLABS, LLC            Topic: 05a

    High quantum efficiency (QE) photocathodes are central for efficient photoinjectors and ultra-fast electron microscopes. Current high QE photo cathode materials like GaAs, alkali-tellurides and alkali-antimonides require ultra-high vacuum and even then have a short life time. Moreover, most of these materials require an ultraviolet light source to operate. Photoemission using a light source in the ...

    SBIR Phase I 2013 Department of Energy
US Flag An Official Website of the United States Government