You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Reverse Engineering Technical Data Packages for Development of Alternate Sources of Supply for DLA NSNs
SBC: Brighton Cromwell, LLC Topic: DLA171002Technical Product Definition Information. In this activity we created a preliminary technical data package (TDP) at a Level 3 Production per MIL-STD-31000 definition. A TDP is a technical description of an item adequate for supporting an acquisition strategy, development, manufacturing development, production, engineering, and logistics throughout the item's lifecycle. The technical description de ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Increase Competition through Small Business Source Approval Request (SAR) for DLA Nuclear Enterprise Support Office (NESO) NSN: 1095-00-488-0829
SBC: Brighton Cromwell, LLC Topic: DLA181006This proposal introduces an approach from Brighton Cromwell to Improve product availability and increase competition through the development of Small Business eligible manufacturing utilizing the DLA’s Land and Maritime (L&M) Limited Source National Stock Number (NSN) List. The list contains NSNs with an Annual Demand Value (ADV) >$10K currently sourced with only 1-2 manufacturers. We are offeri ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Smart Baseplate for Additive Manufacturing
SBC: LUNA INNOVATIONS INCORPORATED Topic: DLA18A001Additive manufacturing (AM) has rapidly evolved into a valuable technique for making parts which, at times, cannot be fabricated through conventional machining methods, or for fabrication of small quantities of complex parts. One challenge in the area of AM is the lack of real-time feedback on the fabrication process and the quality of the part being made. This is especially critical given the rel ...
STTR Phase II 2019 Department of DefenseDefense Logistics Agency -
Reverse Engineering and Source Development for F107 Replacement Components
SBC: MAINSTREAM ENGINEERING CORP Topic: DLA181007The Defense Logistics Agency (DLA) is seeking small businesses capable of manufacturing and supplying an assortment of replacement components for the F107 turbofan engine. The F107 is most commonly used as the propulsion system for cruise missiles. Given the F107’s primary use, maintaining a supply chain capable of keeping the engine in operation is paramount. DLA has stated that the F107 engine ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Self-Decontaminating Textiles
SBC: LUNA INNOVATIONS INCORPORATED Topic: CBD161001Luna Innovations is addressing the need to develop novel fluid repellent textile treatments for military uniforms that will repel and actively decontaminate chemical and biological warfare agents (CBWA). There have been recent significant advances in textile treatments that have demonstrated water, oil and chemical agent resistance that are superior to Quarpel repellent treatments currently used o ...
SBIR Phase II 2019 Department of DefenseOffice for Chemical and Biological Defense -
Advanced Manufacturing Technologies
SBC: ONTO TECHNOLOGY, LLC Topic: DLA152001This Phase II Small Business Innovation Research project develops the scale of lithium-ion direct recycling technologies applied to gain efficiencies in materials management from original manufacturing to end-of-life. The scrap materials are from Defense Logistics Agency manufacturing activities. A successful effort moves direct recycle TRL from 4 to 6, increases process throughput, qualifies mate ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
NanoSonic Sourcing of NSN 8010-01-266-6576 Epoxy Primer Coating
SBC: NANOSONIC INC. Topic: DLA181005During the Phase I SBIR effort, NanoSonic designed, tested, and empirically optimized a two-part epoxy polyamide primer that will meet the performance requirements and distribution goals for NSN: 8010-01-266-6576 Part Name: Epoxy Primer Coating DLA Supply Chain: C&E Weapon System: B-2 Part Description: MILSPEC Part Number M85582-2-C2-0001P. To meet this challenge, NanoSonic implemented a rigorous ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Additive Manufacturing Process Monitoring and Control Technologies
SBC: ARCTOS Technology Solutions, LLC Topic: DLA181002This SBIR will demonstrate coaxial thermal imaging using the Stratonics ThermaViz® sensor as a uniquely effective tool for tracking process metrics, at high-speed, during laser powder bed fusion (LPBF). The Phase II project will then develop this sensing technique for LPBF process qualification and closed-loop control. The key is integrating ThermaViz into UTC’s AMSENSE® in situ monitoring arc ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Additive Manufacturing Process Monitoring and Control Technologies
SBC: Made In Space, Inc. Topic: DLA181002Made In Space, Inc. (MIS) proposes an Aulë Filament Inspection System (AFIS) to provide filament quality control capability for additive manufacturing (AM). AFIS enables the Defense Logistics Agency (DLA) to confidently support AM efforts both internal to DLA and throughout its customer base such as the Marine Corp Advanced Manufacturing Operations Cell. To create the product quality line system, ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Additive Manufacturing Sensor Fusion Technologies for Process Monitoring and Control.
SBC: ARCTOS Technology Solutions, LLC Topic: DLA18A001This Phase II project aims to assemble the key set of sensor modalities that are needed to reliably view the key process anomalies and properties of laser powder bed fusion. The research team will down-select from the Phase I sensors investigated and integrate the sensors into a sensor fusion software package that facilitates data collection and synchronization, and eventually feedback control of ...
STTR Phase II 2019 Department of DefenseDefense Logistics Agency