You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RAPID HIGH RATE LEAD-IN-AIR MONITOR FOR USE AT FIRING RANGES

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  2. AN INNOVATIVE SOFTWARE TOOL TO AID NETWORK ENGINEERS IN PLANNING, UPGRADING, AND MAINTAINING MULTI-NETWORKS

    SBC: Adroit Systems, Inc.            Topic: N/A

    ASI proposes developing a novel MultiNetwork Engineering Tool which is innovative in its unique integration of several state-of-the-art technologies with established technologies. The state-of-the-art technologies include unique network data visualization algorithms, a data driven intelligent equipment database, novel network modeling tools based on graph theory algorithms, network planning heuris ...

    SBIR Phase I 1993 Department of DefenseNavy
  3. An Innovative Pulse Detonation Engine

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  4. An Extensible Expert System for Analysis of Complex Real-Time Distributed Systems

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    Increasing Navy use of embedded computer systems results in stringent requirements for real-time performance, reliability, and cost. Computer systems are critical embedded components of Naval warfare systems. The demands on embedded computer systems are increasing in terms of information processing and storage/retrieval. The designer must analyze results across many dimensions to identify critical ...

    SBIR Phase II 1993 Department of DefenseNavy
  5. System Dependability Assessment Tool

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  6. A Novel True Airspeed Indicator for Helicopters

    SBC: ANALYTICAL SERVICES & MATERIALS INC            Topic: N/A

    A completely new approach is proposed for the accurate measurement and display of the true airspeed of helicopters in hover, low-speed and forward flight. Unlike conventional instruments, the proposed innovation will be characterized by high-frequency response and high sensitivity across the range of helicopter flight speeds. The proposed device will provide accurate speed indication both at low a ...

    SBIR Phase I 1993 Department of DefenseNavy
  7. FRACTAL IMAGE ANALYSIS, AUTOMATION, AND DETECTION FOR THE INTEGRATED UNDERSEA SURVEILLANCE SYSTEM

    SBC: AMRON CORPORATION            Topic: N/A

    THE IUSS HAS AN URGENT NEED FOR MORE EFFICIENT METHODS OF SIGNAL PROCSSSING. TO MEET THIS END, SUBMARINE DETECTION AND CLASSIFICATION SYSTEMS MUST BE REEXAMINED AND MODIFIED. THIS PROPOSAL EXAMINES THE POTENTIAL OF AN INNOVATIVE TECHNIQUE CALLED FRACTAL IMAGE ANALYSIS TOAID OPERATORS TO ACCURATELY AND EFFICIENTLY DETECT AND CLASSIFY SUBMARINES IN A PASSIVE SONAR ENVIRONMENT. FRACTAL IMAGE ANALYSIS ...

    SBIR Phase II 1993 Department of DefenseNavy
  8. Frequency and Wavenumber-Specific Active Vibration Control

    SBC: APTEK, Inc.            Topic: N/A

    A new method for silencing internal machinery generated torpedo noise is proposed. This innovative solution to the problem has the added capabilites of: controlling on a wavevector basis the acoustic signal radiated by the torpedo and simulation of boundary layer excitation on a torpedo hull. The proposed device thus offers the capability to not only suppress internally generated noise, but flow n ...

    SBIR Phase I 1993 Department of DefenseNavy
  9. Low Profile Submarine Antenna Array

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    Due to the limited space and the need for flush mounting charactistics, a new and novel series of antenna systems for communications and ECM is proposed. It is proposed to use dielectromagnetic (DM) materials to miniaturize antennas and for RF DM lens to focus the RF signals into the below the surface antennas. An Astron pioneered subminiature direction finding system using DM materials, will be m ...

    SBIR Phase II 1993 Department of DefenseNavy
  10. Combined Antenna Systems for Assault Amphibian Use

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    Monopole and dipole antennas have been determined to radiate most efficiently when the size of the antenna is proportional to the frequency being transmitted or received, i.e. one-quarter, one-half or one wavelength. As the operating frequency is varied from that ideal frequency nulls begin to develop which threaten the integrity of the communication link. Experience has shown that small excursion ...

    SBIR Phase II 1993 Department of DefenseNavy
US Flag An Official Website of the United States Government