You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Thermophotovoltaic Power Sources

    SBC: EDTEK, INC.            Topic: N/A

    A program is proposed which will inhance the eficiency of key thermo-photovoltaic (TPV) components and significantly lower their cost. A new process for fabricating resonant mesh filters will simplify and lower the cost of their manufacture. Thefeasibility of a new tandem filter will be explored. If successful, this tandem filter would increase the TPV system efficiency by about 38%. We also p ...

    SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense
  2. TPV Power Sources Using Infrared-Sensitive Cells with Commercially Available Radiant Tube Burners

    SBC: Jx Crystals Inc.            Topic: N/A

    JX Crystals presently fabricates infrared sensitive photovoltaic cells under license from Boeing. Also, on a recent Army/DARPA contract, JX Crystals fabricated a custom liquid fuel burner for use in a TPV power source. Herein, we propose to design a 500Watt TPV power source around a commercially available industrial recuperative silicon carbide radiant tube burner capable of operating with an in ...

    SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense
  3. A Methodology and Plan for Assessment of Cognitive Skills and Adaptive Thinking

    SBC: MIRUM CORP.            Topic: N/A

    The Phase I effort produced the designs and sample items for six measures of cognitive skills necessary for effective small unit leadership. The primary objectives of the proposed Phase II effort are to develop further these five measures, including thecomputer simulation, to validate the assessment battery, and to develop and validate a business version of the 2 leadership measures. The last ob ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government