You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH-CURRENT, MICRO-PULSE ELECTRON SOURCE

    SBC: Fm Technologies Inc            Topic: N/A

    A MICRO-PULSE ELECTRON GUN THAT APPEARS CAPABLE OF PEAK CURRENTS OF ABOUT 10 KA WITH A MICRO-PULSE LENGTH OF SEVERAL PICOSECONDS (PS) OCCURING AT FREQUENCIES OF UP TO 10 GHZ IS BEING PLANNED. THE MICRO-PULSES OR BUNCHES ARE PRODUCED BY RESONANTLY AMPLIFYING A CURRENT OF SECONDARY ELECTRONS IN A RADIO FREQUENCY (RF) CAVITY. BUNCHING OCCURS RAPIDLY AND IS FOLLOWED BY SATURATION OF THE CURRENT DENSIT ...

    SBIR Phase II 1993 Department of Energy
  2. AN EFFICIENT 10-20 GIGAHERTZ HIGH-POWER MICROWAVE AMPLIFIER

    SBC: Fm Technologies Inc            Topic: N/A

    THIS PROJECT INVOLVES THE ANALYSIS OF A HIGH HARMONIC, HIGH EFFICIENCY MICROWAVE GENERATOR THAT APPEARS TO BE SUITABLE FOR APPLICATIONS SUCH AS A DRIVER FOR THE NEXT GENERATION OF LINEAR COLLIDERS. THE CONCEPT EMPLOYS A ROTATING "SPIRALING" BEAM TO EXCITE AND AMPLIFY CIRCULARLY POLARIZED MICROWARE RADIATION IN AN INTERACTION OUTPUT WAVEGUIDE. MODULATION OF A LINEAR, HIGH POWER, SMALL DIAMETER BEAM ...

    SBIR Phase I 1993 Department of Energy
  3. AN ION PROBE FOR TIGHTLY-FOCUSED CHARGED PARTICLE BEAMS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    THIS PROJECT PLANS TO DEVELOP A NOVEL, NONPERTURBING DIAGNOSTIC TO MEASURE THE POSITION, RADIUS, LENGTH, AND/OR CHARGE DISTRIBUTION OF TIGHTLY-FOCUSED, CHARGED PARTICLE BEAMS. THIS DIAGNOSTIC EMPLOYS A LOW ENERGY ( 50 KEV), LOW CURRENT ( 1MUA) STREAM OF IONS TO PROBE THE CHARGED PARTICLE BEAM. THE PROBE IONS ARE INJECTED ACROSS THE PATH OF THE RELATIVISTIC BEAM AND ARE DEFLECTED BY THE ELECTROMAGN ...

    SBIR Phase II 1993 Department of Energy
  4. FIBER OPTIC LONG COUNTER

    SBC: FIBERTEK, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  5. HIGH-POWER TRANSVERSE-MODULATION MICROWAVE GENERATOR WITH AXIAL-FIELD CONFINEMENT

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  6. REDUCING UTILITY DEMAND LEVELS BY AUTOMATIC DEMAND PEAK SHAVING WITH USER STANDBY GENERATORS.

    SBC: Hallmark Energy Economics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  7. INLET-PRECHARGED LIMESTONE EMISSION CONTROL (LEC) PROJECT

    SBC: ETHERWARE, LLC            Topic: N/A

    MANY UTILITY AND INDUSTRY COAL-FIRED BOILERS HAVE ELECTROSTATIC PRECIPITATORS (ESPS) ALONE, WHICH ARE NOT CAPABLE OF REMOVING SO2. MANY OLDER ESPS WILL REQUIRE UPGRADING IN THE 1990S TO MEET MORE STRINGENT PARTICULATE STANDARDS. ETS, INC. HAS TESTED ITS PATENTED LIMESTONE EMISSION CONTROL (LEC) SYSTEM, DEMONSTRATING GREATER THAN 90% SO2 REMOVAL CAPABILITY. LECS CAN BE PLACED DOWNSTREAM OF ESPS. IT ...

    SBIR Phase I 1990 Department of Energy
  8. DEPRESSED COLLECTORS FOR MEGAWATT GYROTRONS

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    A PROGRAM IS PROPOSED TO SHOW THE FEASIBILITY OF DEPRESSED COLLECTORS FOR VERY HIGH AVERAGE POWER (APPROX. 1MW) GYROTRON OSCILLATORS FOR FUSION APPLICATIONS. INITIAL CALCULATIONS INDICATE THAT COLLECTION EFFICIENCIES EXCEEDING 75% CAN BE REALIZED. USE OF SUCH A COLECTOR ON A GYROTRON WITH A BASE EFFICIENCY OF 30% WOULD INCREASE THE EFFICIENCY TO OVER 60%. SUCH A DRAMATIC INCREASE IN EFFICIENCY WOU ...

    SBIR Phase I 1990 Department of Energy
  9. AUTOMATION OF THE DETECTION OF DEFECTS IN THE HEAT-EXCHANGERTUBING OF NUCLEAR STEAM GENERATORS

    SBC: Greenbriar Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy
  10. HAZARDOUS ENERGY-RELATED SUBSTANCES

    SBC: Viking Instruments Corp.            Topic: N/A

    THE CONCEPTUAL DESIGN OF A MAN-PORTABLE GAS CHROMATOGRAPH MASS SPECTROMETER (GCMS) IS OUTLINED, TOGETHER WITH ITS APPLICATION AS A DETECTOR OF A BROAD RANGE OF HAZARDOUS ENERGY-RELATED SUBSTANCES. THE PRINCIPAL BENEFITS OF SUCH AN INSTRUMENT ARE ITS PORTABILITY WHICH ALLOWS MEASUREMENTS TO BE MADE ON-SITE, ITS RUGGED, SIMPLE OPERATION, AND ITS SENSITIVITY AND ABILITY TO GIVE UNAMBIGUOUS IDENTIFICA ...

    SBIR Phase I 1983 Department of Energy
US Flag An Official Website of the United States Government