List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. NOVEL- LOW NOISE, LIGHTWEIGHT, 30 KW APU

    SBC: ADIABATICS INCORPORATED            Topic: N/A

    ADIABATICS, INC. IS PLEASED TO PROPOSE A RESEARCH PROGRAM TO DEVELOP A NOVEL "COMPACT, MINIMUM NOISE, AUXILIARY POWER UNIT (APU) FOR LIGHTWEIGHT VEHICLES." THE APU USES A COMMERCIAL DIESEL ENGINE AND AN ADVANCED GENERATOR AND NOVEL COOLING TECHNIQUES TO MEET THE STATED REQUIREMENTS. THE KEY PERSONNEL AT ADIABATICS AND SYNCHROTEK ARE WELL AWARE OF THE NEED TO REDUCE THE SIZE AND WEIGHT OF APU SYSTE ...

    SBIR Phase II 1994 Department of DefenseDefense Advanced Research Projects Agency
  2. Advanced military diesel engine

    SBC: ADIABATICS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  3. Mercury Fiber Electrode for Determining Lead in Blood

    SBC: Bioanalytical Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Health and Human Services
  4. Second Language Intelligibility Trainer

    SBC: COMMUNICATION DISORDERS TECHNOLOGY, INC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Health and Human Services
  5. Digital Design Derivation System for Hardware Synthesis

    SBC: Derivation Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  6. Ultrasound Machine Dense Tissue/Adjunct to Mammography

    SBC: Indianapolis Breast Cancer            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Health and Human Services
  7. GENERAL-PURPOSE MOTION MODULES

    SBC: Kinetic Art and Technology Corporation            Topic: N/A

    IN THE FUTURE, AUTOMATED MACHINERY WILL REQUIRE DISTRIBUTED INTELLIGENT ACTUATORS, SENSORS AND CONTROLS. THIS PHASE I EFFORT WILL PRODUCE A CONCEPTUAL DESIGN FOR AN INTEGRATED SET OF LIGHTWEIGHT, LOW-COST, MODULAR, INTELLIGENT CONTROLLERS AND SPEED REDUCERS FOR USE IN A VARIETY OF AUTOMATION AND ROBOTIC SYSTEMS. THESE WILL BE EXTENDABLE HARDWARE/SOFTWARE MODULES UTILIZING ALTERNATIVE AND ADAPTIVE ...

    SBIR Phase II 1994 Department of DefenseDefense Advanced Research Projects Agency
  8. Rapid Teststrip Assay for Acetaminophen and Salicylate

    SBC: MICRONIX, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Health and Human Services
  9. Hybrid Forecasting Tool for Distriuted Mission Planning

    SBC: Nienhaus & Associates, Inc.            Topic: N/A

    Traditional project management relies on hierarchically structured projects. As organizations decentralize, the need for distributed planning increases concomitant with a greater need for communication. Operations planning through distributed simulation has been shown to be an appropriate means of organizational role playing. We propose as the innovation to apply a hybrid Genetic Algorithm and dec ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  10. Dynamic Simulation of High-Power Machinery Systems

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government