You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
Electrogenerative Reactors for Process Intensified Cogeneration of Power and Liquid Fuel from Shale Gas (Topic 19, Subtopic a)
SBC: Bio2Electric, LLC Topic: 19aWith the abundance of natural gas and its primary components of methane, ethane and propane, there is the opportunity to convert these light alkanes to higher-value products. The growth in natural gas supply in the U.S. has increased substantially since the mid-2000s due to advances in horizontal drilling and hydraulic fracturing. As petroleum prices are volatile, natural gas resources are progres ...
STTR Phase I 2018 Department of Energy -
Demonstration of the technological capability for production of neutron-focusing nickel mirrors
SBC: ELECTROFORMED NICKEL, INC. Topic: 15aNeutron scattering is one of the most useful methods of studying the structure and dynamics of matter. These methods require large installations at national laboratories, such as Oak Ridge National Laboratory (ORNL), National Institute of Standards and Technology (NIST) and other facilities constructed or planned in the US and around the world. These facilities serve a large and diverse community ...
STTR Phase II 2018 Department of Energy -
Brain Targeting Nanoparticle for Drug Delivery in Traumatic Brain Injury
SBC: Weinberg Medical Physics, Inc. Topic: DHA18A001There is an urgent need to bypass or cross the blood brain barrier (BBB) to deliver drugs for TBI treatment. This project aims to develop targted intranasally delivered, magnetically propulsed, and targted nanoparticles for traumatic brain injury (TBI). In Phase I, we will demonstrate the design, fabrication, and in vitro characterization of proposed drug laden magnetic nanoparticles as well as co ...
STTR Phase I 2018 Department of DefenseDefense Health Agency -
IP Access Gateway
SBC: Telluric Labs LLC Topic: 24aThis proposal aims to develop a back-end (BE) board, the “IP Access Gateway” (IPAG), in a commercial PCIe form factor, and build a COTS-based Continuous-Flow Trigger and Data Acquisition system (CF-TDAQ). The system monitors and synchronizes timestamps collected with local timing, and performs the event building of the data chunks from multiple detector sub-systems, front-end (FE) electronics ...
STTR Phase II 2018 Department of Energy -
Fidelity Enhancement of Nuclear Power Plant Simulators Utilizing High Fidelity Simulation Predictions
SBC: WESTERN SERVICES CORPORATION Topic: 30cAccurate simulation of nuclear power plant behavior is necessary for both engineering and training applications. An engineering grade simulator, used for design, safety analysis and operations, is characterized by high fidelity, computational power, lack of real-time capability, and user non-interactive environment. By contrast, a training grade simulator, used for operator training and education, ...
STTR Phase I 2018 Department of Energy -
Low-cost and Flexible Transparent Electrodes Based on Ag–ZTOF (Zn–Sn–O–F) Amorphous Composites Through Ink-jet Printing
SBC: HAZEN RESEARCH, INC. Topic: 09bSn-doped In2O3 (ITO) is the industry standard and most widely used transparent conducting electrode (TCE) because of its good electrical and optical properties. However, ITO has a number of disadvantages: ITO is not a suitable TCE for next-generation, high-efficiency, flexible OLEDs, because of its inappropriate work function, difficulty in creating desired patterns, low stability, delaminantion d ...
STTR Phase I 2018 Department of Energy -
A Concrete Additive Manufacturing Process for Fixed and Floating Wind Turbine Foundations and Towers
SBC: JC Solutions Topic: 14bTall towers and foundations for modern offshore and land-based wind turbines are too large to transport over roads or rail due to their extremely large dimensions. Existing “one-off” on-site construction methods are too expensive, and are too slow for manufacturing foundations and towers in the large numbers needed, especially for offshore components manufactured in ports with limited lay-down ...
STTR Phase I 2018 Department of Energy -
CORC; Cable Based High Field Hybrid Magnets for Future Colliders
SBC: Advanced Conductor Technologies LLC Topic: 26b"The next generation of very high field accelerator magnets (20 T or more) are expected to be made with high-temperature superconductors (HTS) along with conventional low-temperature superconductors (LTS) to reduce cost. The operation and protection of these magnets becomes very challenging particularly if the HTS coils are made with the tapes and operate at a much lower current than the LTS coils ...
STTR Phase II 2018 Department of Energy -
Scaleup of a Combined Spray Pyrolysis and Fluidized-bed Reactor Method for the Production of High Performing Layered Nickel- rich Cathode Materials as a Continuous Process
SBC: HAZEN RESEARCH, INC. Topic: 14aTo increase the utilization of electric vehicles, the US Department of Energy is seeking to reduce the cost of electric vehicle batteries to less than $125/kWh by 2022. To achieve this goal, the costs of cathode materials, which account for approximately 30% of the cost of vehicle batteries, must be reduced significantly. To address the challenge of lowering the costs of advanced lithium battery c ...
STTR Phase II 2018 Department of Energy -
High-Speed Platform for Highly parallel STM lithography and hierarchical Assembly
SBC: Zyvex Labs LLC Topic: 17eNanotechnology has yet to live up to its promise of exploiting properties which emerge at the nanoscale because of the lack of manufacturing precision to control the nanoscale dimensions, thus denying society many energy saving materials and applications. This project targets a key component of an Atomically Precise Manufacturing system: a high-speed sub-nm-precision manufacturing platform for ato ...
STTR Phase I 2018 Department of Energy