You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: ORBITAL SIDEKICK INC            Topic: AF183005

    Unlike current inspection platforms that capture a handful of wide range color bands in the visible spectrum, Orbital Sidekick's high resolution hyperspectral platform captures hundreds of narrow contiguous color bands across the visible and infrared regions of the spectrum, uniquely generating a radiometric footprint of each pixel in every image set. OSK’s unparalleled spectral resolution ...

    SBIR Phase II 2019 Department of DefenseAir Force
  2. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: FALKONRY INC.            Topic: AF191005

    Falkonry LRS is your “Data Scientist in a Box,â€ï¿½ pre-packaged operational machine learning (ML) empowers your teams with pattern discovery, predictive analytics and explanation to improve uptime, performance, quality and safety. Falkonry believes its AI-enabled LRS could add significant value to the processing of electronic intelligence (ELINT) data, at scale and for significantly l ...

    SBIR Phase II 2019 Department of DefenseAir Force
  3. Eye-mounted Display (EMD) / Augmented Reality Contact Lens

    SBC: TECTUS CORPORATION            Topic: AF191005

    Tectus is developing the underlying technology required to deliver an augmented reality platform that enables information to be instantaneous, unobtrusive, and available hands-free. Tectus envisions a future in which technology becomes so small and discreet that it is practically invisible, and where people can access information that is visible only to them and invisible to everyone else. The tec ...

    SBIR Phase II 2019 Department of DefenseAir Force
  4. Edgybees MQ-9 Augmented Reality

    SBC: Edgy Bees Inc.            Topic: AF192D001

    EdgyBees’ Augmentation Engine allows for the addition of augmented reality features to be placed over a camera’s video feed in order to assist orientation and consolidate information for the operator by highlighting key objects and features. Augmentation can take place over live video (from the camera perspective), over virtual sandbox (from an arbitrary perspective) or over Satellit ...

    SBIR Phase II 2019 Department of DefenseAir Force
  5. Innovative Satellite Solutions to Enable Space-Based Communications for Air Force SATCOM Resiliency

    SBC: SWARM TECHNOLOGIES, INC.            Topic: AF191005

    The objective of this Air Force SBIR Phase II project is to meet the national defense-related mission needs of the Air Force in the area of Low Earth Orbit communications and command & control. More specifically, there is a clear Air Force need for SATCOM redundancy and resiliency (Need #6266), that Swarm is uniquely equipped to develop and provide through modification of commercial satellite hard ...

    SBIR Phase II 2019 Department of DefenseAir Force
  6. Prototype Development for 8,000 Samples per Second 3D SADAR and Rapidly Deployable Sensor Hardware

    SBC: Quantum Technology Sciences, Inc.            Topic: A09099

    Quantum has two technical objectives for Phase II. The first is to develop, test, demonstrate, and deliver prototype three-dimensional (3D) array, Seismic Acoustic Detection and Ranging (SADAR) systems with a data sampling rate of 8,000 (8K) per second to automatically detect, classify, report, and localize underground sources for specific seismic-acoustic signals of interest in near real-time. Th ...

    SBIR Phase II 2016 Department of DefenseAir Force
  7. Dimensional Restoration of Aircraft Components Damaged by Corrosion

    SBC: ENGINEERING AND SOFTWARE SYSTEM SOLUTIONS, INC.            Topic: AF131190

    Aircraft and ground support equipment typically require restoration of structure and components damaged by corrosion, wear, and other surface defects. Current repair techniques inspect, clean, and then apply Corrosion Preventative Compounds, but do not provide dimensional restoration. Additionally, these traditional repair techniques may utilize and/or produce hazardous materials and waste. Conseq ...

    SBIR Phase II 2019 Department of DefenseAir Force
  8. Advancing the Space Communications Link Using Internet Protocol

    SBC: Innoflight, Inc.            Topic: AF083221

    The proposed effort will design, build, and demonstrate a revolutionary and long overdue advancement to space communications. Through the use of native IP, Innoflight will introduce seamless networked communications through space vehicle links, ground stations, the mission operations center and end users. Our proposed solution includes a powerful link encoder, IP/HDLC, Type 1 HAIPE encryption, G ...

    SBIR Phase II 2010 Department of DefenseAir Force
  9. Development of Pulse Water Strip of Tungsten Carbide HVOF Coatings and Chrome Plating on Landing Gear Components

    SBC: ENGINEERING AND SOFTWARE SYSTEM SOLUTIONS, INC.            Topic: AF071317

    Aircraft components are typically surface finished requiring removal for typical repair and overhaul processes. Consequently, ES3 has successfully developed a 20KHz PAWSS for cleaning, surface preparation and coating removal of organic and inorganic coatings under SBIR Topic AF071-317, Phase I-III efforts with the US Air Force (USAF) and US Navy that provides a common strip process that is environ ...

    SBIR Phase II 2019 Department of DefenseAir Force
  10. Laser Ignition of Large Scale Combustion Air Heaters

    SBC: CFD RESEARCH CORPORATION            Topic: AF141230

    The AEDC Aero Propulsion Test Unit (APTU) facility completed successful operation at Mach 6 and Mach 7 direct connect tunnel conditions utilizing a prototype Mach 5 free-jet configured Combustion Air Heater (CAH) injection system developed by CFD Research Corporation. These results and upgrades proposed here were presented at the 2018 Hypersonic Technology & Systems Conference. This effort will fu ...

    SBIR Phase II 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government