You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low-cost, Time-resolved Chemical Characterization of Atmospheric Aerosols
SBC: AEROSOL DEVICES INC Topic: 23bThe composition of atmospheric particulate matter (“aerosols”) strongly influences health and environmental impacts, but there exist few time-resolved, long-term records of particle-phase chemical composition due to lack of appropriate monitoring tools. Needed is an instrument that is robust, easy-to-operate, with automated calibrations and data reduction, to provide operationally-inexpensive ...
STTR Phase II 2019 Department of Energy -
Flow Battery Structures to Improve Performance and Reduce Manufacturing Cost
SBC: Faraday Technology, Inc. Topic: 21dRedox flow batteries are a promising technology for electrical energy storage for renewable energy sources; however traditional redox flow batteries are limited in their use due to non-uniform pressure drops and mass transfer limitations, as well as high manufacturing costs related to the felt material costs for the electrode and component alignment challenges during manufacturing.General Statemen ...
STTR Phase II 2013 Department of Energy -
Complete Muon Collider Cooling Channel Design and Simulations
SBC: MUPLUS INC. Topic: 28bConsiderable progress has been made in developing promising subsystems for muon beam cooling channels to provide the great reduction of emittances required for an Energy-Frontier Muon Collider; but an end-to-end design is lacking. Meanwhile, the recent discovery of a Higgs-like boson has created interest in the high-energy physics community for a Higgs Factory to investigate whether its propertie ...
STTR Phase II 2013 Department of Energy -
A Corrosion Test Station for Improved Characterization and Examination Capabilities of Advanced Nuclear Reactor Fuels and Materials
SBC: Niowave, Inc. Topic: 30iLiquid-metal coolants are one of the most promising solutions for the challenges of advanced high temperature nuclear reactor systems.They optimize heat transfer, neutronics, safety, and compactness of the reactor systems.Molten lead and lead-bismuth eutectic (LBE) are the primary coolant candidates due to their unique thermo-mechanical and neutronics properties.However, they are highly corrosive ...
STTR Phase II 2019 Department of Energy -
Real-Time Distributed Quench Detection In High Temperature Superconductor Magnets
SBC: LUNA INNOVATIONS INCORPORATED Topic: 20aNuclear fusion has great potential for supplying global energy needs with a clean, abundant energy source. Advanced superconducting magnets will be used to contain the plasma at the center of the reactor. To operate these magnets, new sensors are needed to monitor the superconductors in real-time to detect the signs that the superconductor may quench (lose superconducting properties), so that corr ...
STTR Phase II 2019 Department of Energy -
Smart Baseplate for Additive Manufacturing
SBC: LUNA INNOVATIONS INCORPORATED Topic: DLA18A001Additive manufacturing (AM) has rapidly evolved into a valuable technique for making parts which, at times, cannot be fabricated through conventional machining methods, or for fabrication of small quantities of complex parts. One challenge in the area of AM is the lack of real-time feedback on the fabrication process and the quality of the part being made. This is especially critical given the rel ...
STTR Phase II 2019 Department of DefenseDefense Logistics Agency -
REBCO Coated Conductor Cables for Fusion Magnets
SBC: ADVANCED CONDUCTOR TECHNOLOGIES LLC Topic: 22cThe feasibility for fusion as a practical energy source needs to be enhanced significantly by removing some of the restrictions that low-temperature superconductors put on the fusion magnet systems. This can be done by using high-temperature superconductors, allowing for much larger temperature margins, a higher magnet performance and less mechanical degradation during operation. There are curren ...
STTR Phase II 2013 Department of Energy -
Additive Manufacturing Sensor Fusion Technologies for Process Monitoring and Control.
SBC: ARCTOS Technology Solutions, LLC Topic: DLA18A001This Phase II project aims to assemble the key set of sensor modalities that are needed to reliably view the key process anomalies and properties of laser powder bed fusion. The research team will down-select from the Phase I sensors investigated and integrate the sensors into a sensor fusion software package that facilitates data collection and synchronization, and eventually feedback control of ...
STTR Phase II 2019 Department of DefenseDefense Logistics Agency -
Improved Capillary Guided Laser Wakefield Accelerators based on Diamond Materials
SBC: EUCLID TECHLABS, LLC Topic: 03dThe laser plasma accelerator (LPA) is a very promising technology for generating gamma rays for the detection of contraband bulk nuclear materials, but is currently limited by the rate at which the beam can be pulsed. Erosion of the capillary plasma channel is the main limiting factor and can be mitigated through the use of artificial diamond to construct the channel. Computational modeling and ...
STTR Phase II 2013 Department of Energy -
Low Cost Data Acquisition Synchronization for Nuclear Physics Applications
SBC: KLIMA JOANNA Topic: 27bThe DOE Office of Nuclear Physics (NP) seeks innovations that will advance our nation’s capability to perform nuclear physics research, and more specifically to improve DOE Nuclear Physics (NP) Facilities and the wider NP community experimental programs. For example, data acquisition (DAQ) for the Facility for Rare Isotope Beams (FRIB), currently under construction, will require considerable spe ...
STTR Phase II 2019 Department of Energy