You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Sourcing for Critical ALRE Items

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA172001

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI). Ten ALRE National Stock Number (NSN) items were identified with annual demand values over $10,000 with two or fewer approved sources.Mainstream Engineering has carefully reviewed the ten NSNs provided ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Cost and Lead Time Reduction for Hard to Source Items

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA172002

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for Land and Maritime Hard to Source Items (HSIs). Three National Stock Number (NSN) / part number (PN) combinations were identified with annual demand values over $10,000 with fewer than two approved sources.Mainstream Engineering has carefully reviewed the NSN/PN combinations provided in the solicitat ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Additive Manufacturing Sensor Fusion Technologies for Process Monitoring and Control.

    SBC: ARCTOS Technology Solutions, LLC            Topic: DLA18A001

    Universal Technology Corporation (UTC) has teamed with the University of Dayton Research Institute (UDRI), Stratonics, and Macy Consulting to demonstrate not only the transitionability into commercial systems, but also to develop the data analytics and monitoring and control requirements to extract the full value fromseveral sensors, including the Stratonics ThermaViz, acoustic and profilometry se ...

    STTR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Additive Manufacturing Sensor Fusion Technologies for Process Monitoring and Control.

    SBC: X-Wave Innovations, Inc.            Topic: DLA18A001

    Additive Manufacturing (AM) is a modern and increasingly popular manufacturing process for metallic components, but suffers from well known problems of inconsistent quality of the finished product. Process monitoring and feedback control are therefore crucial research areas with a goal of solving this problem. To address this concern, X-wave Innovations, Inc. (XII) and the University of Dayton Res ...

    STTR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. Achieving Transformative Productivity through application of Collaborative Augmented Reality Systems (CARS)

    SBC: VECNA TECHNOLOGIES, INC            Topic: DLA181001

    The Defense Logistics Agency (DLA) is seeking to automate parts of their procurement, logistics, and distribution processes by applying Augmented Reality (AR) solutions to increase efficiency and reduce costs. Vecna Robotics' world-leading automation consulting team is well-positioned to leverage a deep and broad understanding of advanced technology and its application to warehouse operations. Vec ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  6. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: ARCTOS Technology Solutions, LLC            Topic: DLA181002

    This project aims to make Laser Powder Bed Fusion (LPBF) additive manufacturing a practical tool for supply chain management for the Defense Logistics Agency.The key step is developing process standardization to make LBPF quality vendor independent. This project will seek to demonstrate the use of a promising high speed melt pool monitoring device as a practical means to establish such process sta ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  7. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: Made In Space, Inc.            Topic: DLA181002

    Made In Space, Inc. (MIS) and Siemens PLM Software propose an integrated Automated Processing. Monitoring, Control and Remediation System (Aul) to provide a process monitoring and control capability. Made In Space, Inc. leads the effort based on integrating Made In Space, Inc., proven inspection sensors systems with a Digital Thread for Additive Manufacturing (DTAM) system, co-developed by Siemens ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  8. Source Approval for B-52 Wing to Fairing Seal

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA181007

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for a number of NESO items with annual demand values over $10,000 and fewer than two approved sources. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The B- ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  9. Reverse Engineering of MILSTAR Battery Pack

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA182003

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for the MILSTAR system battery assembly. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The MILSTAR nickel-metal hydride battery pack lacks sufficient comme ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  10. Source Approval and Low Rate Production of the Valve Piston (4810-01-269-4808)

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA183006

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) to facilitate NESO in supporting the needs of the U.S. Air Force and U.S. Navy nuclear communities. Mainstream Engineering has carefully reviewed the technical data package for NSN 4810-01-269-4808 provided in the solicitation and is confident that we possess the manufacturing capability, quality manage ...

    SBIR Phase I 2019 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government