You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Recovery Act- Scale-up of the Nanomanufacturing of Coated Powders for Superior Battery Electrode Materials

    SBC: ALD NANOSOLUTIONS, INC            Topic: 09b

    There is significant opportunity for energy efficiency improvements in the industrial and manufacturing sectors in the U.S., both from the production and consumption perspective. Higher energy density battery materials will play a role in both, through improved storage of electricity from renewable sources, the enabling of electric vehicles, and through the development of longer lasting, higher po ...

    STTR Phase I 2010 Department of Energy
  2. Mobile Ice Nucleus Counter

    SBC: Droplet Measurement Technologies, LLC            Topic: 32c

    Ice crystals can form spontaneously from the freezing of water droplets at temperatures colder than -38

    STTR Phase I 2010 Department of Energy
  3. Ultra Low-Power and Embeddable Blade-Condition Monitor

    SBC: Extreme Diagnostics, Inc.            Topic: 07c

    This SBIR/STTR project delivers an ultra-low power structural health monitoring (SHM) system that uses autonomous, wirelessly embedded sensors to monitor and assess structural integrity in wind turbine blades. EASE features impedance-based active SHM, which is highly sensitive to damage like cracks, delimitations, mass variations, fastener failures and stiffness changes. Blades are the only wind t ...

    STTR Phase I 2010 Department of Energy
  4. Recovery Act- Novel Method for Dewatering Using Lateral Displacement Array

    SBC: Phycal LLC            Topic: 10c

    The cost of dewatering particles is inversely proportional to particle size. Costs dramatically increase as particle size approaches 10

    STTR Phase I 2010 Department of Energy
  5. Nickel-Based Amorphous Metal Membranes for Water Gas Shift Reactors

    SBC: MAINSTREAM ENGINEERING CORP            Topic: 10c

    Hydrogen produced today from coal, natural gas, or biomass must be separated and purified outside the reactors using pressure swing absorption (PSA), a process that requires significant additional space and energy. Placing hydrogen-permeable membranes inside the reactors themselves would allow hydrogen to diffuse out, thereby reducing the cost of hydrogen production. In this Phase I effort, Mainst ...

    STTR Phase I 2010 Department of Energy
  6. Development of an SRF Crab Crossing Cavity for an Electron Ion Collider

    SBC: Niowave, Inc.            Topic: 45c

    The highest priority in the Nuclear Physics program is, at present, the Facility for Rare Isotope Beams. In the longer term it is likely that a high priority will be an Electron Ion Collider, and several concepts are under development. In order to achieve the high luminosities that would be required to make such a machine attractive, some kind of bunch crabbing system will be required. For example ...

    STTR Phase I 2010 Department of Energy
  7. Development of an SRF Deflecting/Crabbing System for FermiLab's Project-X

    SBC: Niowave, Inc.            Topic: 65g

    The only HEP laboratory left in the US is Femilab and the operation of the Tevatron will cease soon after the LHC at CERN starts accumulating data, either in 2010 or 2011. In order for a presence in HEP to be retained in the US, Fermilab is exploring a number of options, centered around what is called Project X. Several scenarios are being considered but will likely include a ~2GeV proton accelera ...

    STTR Phase I 2010 Department of Energy
  8. Enhanced Methane Production by Co-Gasification of Potassium-Rich Biomass and Coal

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: 25a

    Natural gas, which is predominantly methane, is widely used by industry as a chemical feedstock and as a fuel for power generation. The increasing price and diminishing domestic supply of natural gas creates an incentive to develop a low-cost replacement for the fuel. Coal gasification is one approach to provide the alternative fuel. However, the dominant commercially available coal gasifiers are ...

    STTR Phase I 2010 Department of Energy
  9. Green Storage for HPC with Solid State Disk (SSD) Technologies

    SBC: RNET TECHNOLOGIES INC            Topic: 38a

    Solid State Drives (SSDs) are emerging as attractive alternatives to traditional HDDs due to there reduced power consumption and potential for increased performance. SSDs have the potential to improve the performance of both Checkpoint Restart (CPR) and the Metadata Server (MDS) for high performance File Systems, e.g., Lustre. However, the write performance of SSDs is relatively poor (compared to ...

    STTR Phase I 2010 Department of Energy
  10. HPC Application Energy Profiling for Energy Optimization

    SBC: RNET TECHNOLOGIES INC            Topic: 36a

    Energy consumption is quickly becoming one of the primary bottlenecks of compute clusters and supercomputers. The DOE is a primary developer and consumer of these power hungry supercomputers, however smaller cluster machines are also widely used through other government agencies and industries. Yet, there are few power profiling tools that allow application developers transparent insight into the ...

    STTR Phase I 2010 Department of Energy
US Flag An Official Website of the United States Government