You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SIGMA: Speedy Imagery Geo-registration and Motion Analysis

    SBC: VISION SYSTEMS INC            Topic: AF131151

    ABSTRACT: VSI proposes the development of the SIGMA (Speedy Imagery Geo-registration and Motion Analysis) system, which will address three key requirements by the end of Phase II: (i) adapt to different type of sensors, sensor-configurations and sensor operating conditions, (ii) handle large amount of data in real-time or close to real-time using limited resources, and (iii) operate under conditi ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Thermally Stable High Energy Lithium-Ion Batteries for Naval Aviation Applications

    SBC: Yardney Technical Products, Inc.            Topic: N08017

    Yardney is proposing to take the technology we have previously developed in Phase 1 and move toward thinner cell designs to meet the extreme temperature and power requirements of the next generation of high power Naval Aircraft. Just as the optimum Hybrid Electric Vehicle batteries were a step towards more power and thus thinner design, the optimum battery for high power, high energy Naval aviatio ...

    SBIR Phase II 2015 Department of DefenseNavy
  3. LOW-COST, HIGH EFFICIENCY INTEGRATION OF SOLID-STATE LIGHTING AND BUILDING CONTROLS USING A PET POWER DISTRIBUTION SYSTEM

    SBC: VoltServer            Topic: 03a

    The primary barrier to widespread adoption of solid-state lighting is its high initial cost relative to other options approximately two times more expensive than equivalent compact fluorescent lamps, and five times more expensive than equivalent downlight fixtures. The performance and cost of solid-state lighting driver circuitry, which comprises 15-20% of the cost of a commercial lamp, operates ...

    SBIR Phase II 2015 Department of Energy
  4. Wideband Sub-Array Digital Receiver Exciter (DREX)

    SBC: Applied Radar, Inc.            Topic: MDA08028

    Applied Radar has developed a multi-channel wideband digital receiver/exciter (DREX) module denoted as the Single Channel Open Architecture Receiver Exciter (SCORE-X750) which operates at X-band (tunable over 812 GHz) with 750 MHz of instantaneous bandwidth. This DREX module is designed for ground-based radars and can be used in new designs or in retrofit and modernization of existing radars. The ...

    SBIR Phase II 2015 Department of DefenseMissile Defense Agency
  5. Integration of Complex Geometry, 3D Woven Preforms via Innovative Stitching Technique

    SBC: T.E.A.M., INC.            Topic: H701

    Thick, 3D woven carbon/phenolic composites offer potential improvement over legacy thermal protection systems (TPS) for re-entry vehicle heat shield applications. However due to the scale and complexity of typical re-entry vehicle structures, it is likely that multiple 3D woven panels would need to laid up to create the overall heat shield, creating potential weak spots at the panel joints. In Pha ...

    SBIR Phase II 2015 National Aeronautics and Space Administration
  6. IGF OT IGF VALIDATION OF MOBILE TECHNOLOGIES FOR CLINICAL ASSESSMENT

    SBC: Pro-Change Behavior Systems, Inc.            Topic: NCI

    Not Available

    SBIR Phase II 2015 Department of Health and Human ServicesNational Institutes of Health
  7. IGF OT IGF FY IWIN NAVIGATING YOUR PATH TO WELL BEING SBIR PHASE II BASE AWARD PERIOD OF PERFORMANCE

    SBC: Pro-Change Behavior Systems, Inc.            Topic: NIDA

    Not Available

    SBIR Phase II 2015 Department of Health and Human ServicesNational Institutes of Health
US Flag An Official Website of the United States Government