You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Datasonics, Inc.            Topic: N/A

    THERE IS A NEED FOR DEVELOPMENT OF A COMMERCIALLY AVAILABLE ECONOMICAL ACOUSTIC DOPPLER BACKSCATTER INSTRUMENT WHICH CANBE EASILY DEPLOYED AND USED TO SIMULTANEOUSLY ACQUIRE CURRENT PROFILE DATA AND BACKSCATTER AMPLITUDE INFORMATION RELATING TO PARTICLE CONCENTRATIONS IN THE WATER COLUMN. THE RESEARCH PROPOSED IN PHASE I IS DIRECTED AT TWO AREAS OFDOPPLER BACKSCATTER MEASUREMENT WHERE ADVANCES IN ...

    SBIR Phase I 1983 Department of the Interior
  2. THREE-DIMENSIONAL UNSATURATED GROUND WATER FLOW

    SBC: SIMONS, LI AND ASSOCIATES INC.            Topic: N/A

    THIS PROPOSAL IS TO MODEL THE TRANSPORT OF POLLUTANTS IN UNSATURATED POROUS MEDIA FLOW. THE MODEL TO BE USED WILL BE A THREE-DIMENSIONAL UNSATURATED-SATURATED FLOW MODEL COUPLED WITH A THREE-DIMENSIONAL CONVECTION-DISPERSION EQUATION. THE MODEL WILL BE IMPLEMENTED ON A CDC CYBER 205 SUPERCOMPUTER WHICH HAS THE SIZE AND SPEED NECESSARY TO MAKETHIS APPROACH A REALITY. PHASE I OF THE PROJECT WILL BE ...

    SBIR Phase I 1983 Department of the Interior
  3. N/A

    SBC: STARFIRE ENGINEERING INC.            Topic: N/A

    WHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...

    SBIR Phase I 1983 Department of the Interior
  4. N/A

    SBC: TRADCO CHEMICAL CORPON            Topic: N/A

    USING RADIO TELEMETRY MODEMS, IS CURRENTLY POSSIBLE. THIS IS NECESSARY BECAUSE LACK OF MONITORING CAUSES INADEQUATE CONTROL OF INTERNAL CORROSION TAKING PLACE INSIDE OFFSHORE PIPELINE SYSTEMS. THE NET RESULT IS PIPELINE FAILURE DUE TOTHE EFFECTS OF CORROSION. THE RESULT OF PIPELINE FAILURE WILL BE AN OIL SPILL IN COASTAL WATERS. AS THE NATION'S OFFSHORE PIPELINE SYSTEM GROWS OLDER, THE NET EFFECTS ...

    SBIR Phase I 1983 Department of the Interior
US Flag An Official Website of the United States Government