You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LINEAR SOLID STATE MICROWAVE POWER AMPLIFIER

    SBC: Microwave Radio Corp.            Topic: N/A

    MICROWAVE RADIO CORPORATION PROPOSES TO PERFORM ADEQUATE STUDY AND TESTING TO SPECIFY A FORM, FIT, AND FUNCTIONAL REPLACEMENT FOR THE TWT AMPLIFIER IN THE AN/FRC-173(V) DRAMA RADIO.

    SBIR Phase II 1990 Department of DefenseNavy
  2. LONG PULSE LASER AMPLIFIER FOR LASER RADAR APPLICATIONS

    SBC: AMSEN TECHNOLOGIES LLC            Topic: N/A

    A METHOD FOR CREATING AND AMPLIFYING LONG PULSE LASER WAVEFORMS (CO2, UV LASER, ETC.) IS BEING INVESTIGATED THAT COULD ELIMINATE AUXILIARY E-BEAM IONIZATION AND OPTICAL ISOLATION PROBLEMS ASSOCIATED WITH A MASTER OSCILLATOR/POWER AMPLIFIER (MOPA) CONFIGURATION. FREQUENCY STABILITY COULD ALSO BE IMPROVED BY REMOVING MOST LIMP INDUCED FREQUENCY CHIRP. THE METHOD COULD BE CAPABLE OF PRODUCING A HIGH ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
  3. INDUCTION LINAC DRIVEN FREE ELECTRON LASER WITH FERRITE MATERIALS

    SBC: Science Research Laboratory, Inc            Topic: N/A

    PROPERTIES OF FERRITE MATERIALS PLAY A KEY ROLE IN THE DESIGN OF BOTH ACCELERATOR CELLS AND DRIVERS FOR INDUCTION LINAC DRIVEN FREE ELECTRON LASERS (ILFELS). TIME-DEPENDENT HYSTERESIS LOSSES, COMBINED WITH THERMAL CONDUCTIVITY, CURIE POINT, AND GEOMETRY OF THE FERRITE CORE PLACE LIMITATIONS ON BOTH ACCELERATOR PULSE LENGTH AND DUTY FACTOR. THIS IN TURN IMPACTS THE AVERAGE OUTPUT POWER, EFFICIENCY ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
  4. FLUORINATED DIAMOND THIN FILMS FOR TRIBOLOGICAL APPLICATIONS

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    AN APPROACH IS BEING INVESTIGATED FOR THE FLUORINATION OF DIAMOND THIN FILMS FOR TRIBOLOGICAL APPLICATIONS. THE APPROACH USES LOW PRESSURES OF F AND/OR CFX FREE RADICALS. TO DEMONSTRATE THE FEASIBILITY OF THIS APPROACH, DATA IS BEING COLLECTED ON: FLUORINATION KINETICS, THE COMPOSITION AND STRUCTURE OF THE SURFACE AND NEAR SURFACE LAYERS, THE EFFECTS OF TEMPERATURE ON THE FLUORINATION PROCESS, AND ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
  5. SUPERLATTICE BUFFER LAYERS FOR LOW-DEFECT GAAS EXPOTAXIAL FILMS ON IMPERFECT GAAS SUBSTRATES

    SBC: Spire Corporation            Topic: N/A

    THE LACK OF REPRODUCIBLY UNIFORM, LOW-DEFECT GAAS MATERIAL REMAINS A MAJOR OBSTACLE TO THE DEVELOPMENT OF ADVANCED MICROWAVE DEVICE TECHNOLOGIES, ESPECIALLY DIGITAL AND MONOLITHIC MICROWAVE INTEGRATED CIRCUITS. SPIRE PROPOSES TO CIRCUMVENT THE SHORTCOMINGS OF MELT-GROWN GAAS WAFERS BY MEANS OF SUPERLATTICE BUFFER LAYERS, WHICH WOULD ACT AS BARRIERS TO THREADING DISLOCATIONS IN ADDITION TO PROVIDIN ...

    SBIR Phase II 1986 Department of DefenseAir Force
  6. RAMAN DETECTION FOR BALLOONBORNE LIDAR

    SBC: VISIDYNE, INC.            Topic: N/A

    THE FEASIBILITY OF ADDING A RAMAN DETECTION SYSTEM, FOR THE MEASUREMENT OF ATMOSPHERIC CONSTITUENTS, TO AN EXISTING BALLOONBORNE LIDAR PAYLOAD WILL BE INVESTIGATED. THE BALLOONBORNE LIAR IS CURRENTLY USED TO MAKE RAYLEIGH/MIE ATMOSPHERIC BACKSCATTER MEASUREMENTS. THE FEASIBILITY STUDY WILL INCLUDE, FOR THE VARIOUS TYPES OF RAMAN SCATTERING AN AN ERROR ANALYSIS BASED ON THE OPERATING PARAMETERS OF ...

    SBIR Phase II 1986 Department of DefenseAir Force
  7. CLEARING OF MILITARY SMOKES AND AEROSOLS

    SBC: GEO-CENTERS, INC.            Topic: N/A

    THE GOAL OF THE PROPOSED PROGRAM IS TO DEVELOP A DEVICE TO CLEAR MILITARY SMOKES AND AEROSOLS. SPECIFIC OBJECTIVES WITHIN THE PROPOSED PROGRAM ARE DIRECTED TOWARDS THE DEVELOPMENT AND DEPLOYMENT OF CHARGED SCAVENGERS AS AN EFFECTIVE MEANS TO REMOVING AEROSOL PARTICLES AND SMOKES. INCREASING THE CHARGE ON THE SCAVENGING MATERIAL GREATLY ENHANCES THE REMOVAL EFFICIENCY OF THE CLEARING MATERIAL. THE ...

    SBIR Phase II 1990 Department of DefenseArmy
  8. RAMAN COVERTED MID-IR LASER

    SBC: ABIOMED, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSAL IS THE DEVELOPMENT OF A PULSED MID-IR LASER IN THE 3.5 TO 4.1 MICROMETER ATMOSPHERIC TRANSMISSION WINDOW. SUCH SPECTRAL SOURCE IS RELEVANT TO A VARIETY OF TACTICAL APPLICATIONS. THE DF CHEMICAL LASER HAS BEEN THE CHOICE, BUT SUFFERS FROM WASTE FUEL MANAGEMENT PROBLEMS. NO OTHER EFFICIENT DIRECT LASING SOURCE IS AVAILABLE. TO OBTAIN SUCH A SOURCE, WE PROPOSE THE USE O ...

    SBIR Phase II 1986 Department of DefenseArmy
  9. ALL SOLID-STATE INTEGRATING DOSIMETER

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    RECENTLY, RESEARCH AT SEVERAL GOVERNMENT FACILITIES HAS RESULTED IN SIGNIFICANT ADVANCES IN BOTH THE ELECTRONIC AND DETECTOR ASPECTS OF INTEGRATING RADIATION DOSIMETERS. ONE PARTICULAR APPROACH, THE LOS ALAMOS MULTIDETECTOR RADIATION MONITOR, IS A MICROPROCESSOR BASED INSTRUMENT, CAPABLE OF INTERROGATING SEVERAL DIFFERENT NUCLEAR DETECTORS SIMULTANEOUSLY. ALTHOUGH USING GEIGER TUBES FOR THE GAMMA ...

    SBIR Phase II 1986 Department of DefenseAir Force
  10. IN-ARRAY DIGITAL BEAM FORMING ARCHITECTURE

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    IT IS PROPOSED TO DEVELOP AND EVALUATE AN ARCHITECTURE FOR A MULTIELEMENT RADAR RECEIVING ARRAY WHICH PERFORMS DIGITAL BEAM FORMING (DBF) WITHIN THE RECEIVING ARRAY ITSELF, USING EACH ELEMENT AS A NODE OF A SYSTOLIC-LIKE ARRAY PROCESSOR. THE PROCESSOR ASSOCIATED WITH EACH ELEMENT OF THE ARRAY WILL PRODUCE A DIFFERENT SPATIAL BEAM. THIS DISTRIBUTED ARRAY PROCESSING CAPABILITY CAN BE REALIZED BY ADD ...

    SBIR Phase II 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government