You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES

    SBC: Fiber Materials, Inc.            Topic: N/A

    FIBER MATERIALS, INC. (FMI) PROPOSES SENSORS WHICH CAN BE EMBEDDED IN PAVEMENT TO MEASURE STRESS AND STRAIN FROM TRUCKS PASSING OVER AT SPEEDS UP TO 60 MPH. THESE SIMPLE, DURABLE SENSORS WILL BE MADE FROM PIEZOELECTRIC COMPOSITES WHICH ACT AS PASSIVE SENSORS AND DEVELOP A CHARGE PROPORTIONAL TO THE APPLIED PRESSURE. THE CHARGE IS CONVERTED TO A VOLTAGE WHICH IS RECORDED ON NEARBY EQUIPMENT. THE PH ...

    SBIR Phase II 1995 Department of Transportation
  2. COMPREHENSIVE INTRMODAL FREIGHT TRANSPORTATION VISUAL DATABASE

    SBC: Reebie Associates            Topic: N/A

    THIS PROJECT WILL DEMONSTRATE THE VALUE OF DELIVERING INTERMODAL FREIGHT DATA TO A WIDE VARIETY OF TRANSPORTATION PLANNERS; FEDERAL, STATE, LOCAL AND ULTIMATELY SOME PRIVATE SECTOR USERS. THE PROJECT'S CHALLENGE IS TO MAKE DATA ACCESSIBLE IN TERMS OF THE USER'S ABILITY TO INTERACT WITH VARIOUS SOURCES AND DEPTHS OF INFORMATION AND THE SYSTEM'S ABILITY TO BE TIME RESPONSIVE. THE FACT THAT THE DATA ...

    SBIR Phase II 1995 Department of Transportation
US Flag An Official Website of the United States Government