You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GeoReferenced, UAVBased 3D Surveying System for Precision Construction

    SBC: VOXTEL, INC.            Topic: 32f

    For the construction industry, compact, highly accurate and low cost mobile lidar systems are needed for acquiring the real world 3D geo-registered data required to generate the as built models of constructions used in building information modeling (BIM). This is particularly important for small modular reactors (SMRs), where BIM is needed to support planning, excavation, construction, commissioni ...

    SBIR Phase II 2016 Department of Energy
  2. Development of a New Analytical Technology in Support of Oil and Natural Gas Extraction

    SBC: AMETHYST RESEARCH INC            Topic: 21c

    Over the past decade, advances in shale characterization and stimulation technology have opened Hydrocarbon bearing shale to exploitation. The success of all of these plays can depend on the proper characterization of the shale reservoir. To determine if favorable composition and structure are present, it is currently necessary to conduct a number of different analyses that are time consuming and ...

    SBIR Phase II 2016 Department of Energy
  3. Modification of the Composition and Quality of Hybrid Poplar Biomass in the Pacific Northwest

    SBC: GREENWOOD RESOURCES, INC.            Topic: 18

    73021-There is a pressing need for the development of renewable energy sources in the Pacific Northwest. Hybrid poplar plantations have been developed extensively in the region for the pulp and paper, veneer, furniture, and environmental-remediation industries, and can be expanded further to provide renewable raw materials for the biofuels and bioproducts industries. In this project, current eli ...

    SBIR Phase II 2004 Department of Energy
  4. Low Cost, High Current Advanced Inverter Packaging with Integral Liquid-Cooled Heat Exchanger

    SBC: Rinehart Motion Systems, Llc            Topic: 24

    73208-Electric and Hybrid vehicles, fuel cell generators, static energy storage systems, photovoltaic farms and a host of emerging alternative power technologies could reduce our need for foreign oil imports, and reduce global pollution. These technologies are not presently cost effective, in large part due to the cost and reliability of the power electronics required to convert DC power to AC po ...

    SBIR Phase II 2004 Department of Energy
  5. STOCHASTIC MODELING OF ANTISYMMETRIC BUFFET LOADS ON HORIZONTAL STABILIZERS

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase II 1995 Department of Transportation
  6. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    AN IMPROVED METHOD OF WEIGHING TRUCKS WHILE IN MOTION IS PROPOSED. TO INCREASE EFFICIENCY AND REDUCE TIME LOST AT WEIGH STATIONS, THE TRUCKING INDUSTRY NEEDS TO EXCHANGE DATA, INCLUDING WEIGHT DATA, BETWEEN MOVING TRUCKS AND ENFORCEMENT FACILITIES. LEGALLY LOADED TRUCKS WOULD THEN BE ABLE TO PROCEED WITHOUT STOPPING. THIS INVOLVES WEIGH-IN-MOTION. PRESENT WEIGHING TECHNIQUES INVOLVE LOAD CELLS OR ...

    SBIR Phase II 1995 Department of Transportation
  7. AN ACOUSTIC PLATE MODE AQUEOUS MERCURY SENSOR

    SBC: BIODE, INC.            Topic: N/A

    THERE IS A CRITICAL NEED FOR A FAST, SIMPLE SENSOR FOR AQUEOUS MERCURY IN WASTE, SURFACE, AND GROUND WATER. THIS SENSOR IS REQUIRED FOR THE DOE REMEDIATION EFFORTS AS WELL AS THE MORE WIDESPREAD EFFORTS IN ENVIRONMENTAL PROTECTION. SUCH A SENSOR SHOULD BE ABLE TO REACT TO NANOGRAM PER MILLILITER LEVELS OF MERCURY. THE SENSOR IS CAPABLE OF DIRECT IMMERSION IN SOLUTION AND SHOULD PROVIDE CONTINOU ...

    SBIR Phase II 1995 Department of Energy
  8. A RESONANT CONVERTER FOR UNIVERSAL WIND APPLICATION

    SBC: Electronic Power            Topic: N/A

    WITH A VARIABLE-SPEED GENERATION (VSG) SYSTEM, A WIND TURBINE CAN TURN AT ANY SPEED AND STILL PRODUCE CONSTANT FREQUENCY AND VOLTAGE POWER WHICH IS COMPATIBLE WITH THE GRID. THE PRIMARY BENEFITS OF VSG INCLUDE INCREASED ENERGY PRODUCTION, INCREASED POWER CAPACITY, SOFT-STARTS, CONTROL OF TORQUE PERTURBATIONS, DYNAMIC ELECTRICAL BRAKING, AND POWER FACTOR CONTROL. ALL OF THE MODERN TECHNIQUES FOR ...

    SBIR Phase II 1995 Department of Energy
  9. EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES

    SBC: Fiber Materials, Inc.            Topic: N/A

    FIBER MATERIALS, INC. (FMI) PROPOSES SENSORS WHICH CAN BE EMBEDDED IN PAVEMENT TO MEASURE STRESS AND STRAIN FROM TRUCKS PASSING OVER AT SPEEDS UP TO 60 MPH. THESE SIMPLE, DURABLE SENSORS WILL BE MADE FROM PIEZOELECTRIC COMPOSITES WHICH ACT AS PASSIVE SENSORS AND DEVELOP A CHARGE PROPORTIONAL TO THE APPLIED PRESSURE. THE CHARGE IS CONVERTED TO A VOLTAGE WHICH IS RECORDED ON NEARBY EQUIPMENT. THE PH ...

    SBIR Phase II 1995 Department of Transportation
  10. COST EFFECTIVE STIMULATION OF SHALLOW GAS WELLS USING HIGH ENERGY GAS FRACTURING FIELDED WITHOUT A WIRELINE OR WORKOVER RIG

    SBC: J Integral Engineering            Topic: N/A

    CURRENT MODELS AND DATA SHOW THAT HIGH ENERGY GAS FRACTURING (HEGF) HAS GREAT POTENTIAL AS A STIMULATION TOOL IN SHALLOW GAS STORAGE WELLS. IN THESE WELLS THE IN SITU STRESSES ARE SUFFICIENTLY LOW FOR THE PROCESS TO GENERATE ADEQUATE GAS VOLUMES AND TO CREATE AN EFFECTIVE MULTIPLE FRACTURE NETWORK. TO ADDRESS THIS OPPORTUNITY, HEGF FIELDING TECHNIQUES MUST BE SIMPLIFIED AND COSTS REDUCED TO PROV ...

    SBIR Phase II 1995 Department of Energy
US Flag An Official Website of the United States Government