You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  2. Fast Curing Modular Composite Patch System for Field Applications

    SBC: CONTINUUM DYNAMICS INC            Topic: SOCOM07002

    SOCOM requires a method to field repair multiple materials as well as to mount armor and related hardware for a variety of tactical purposes with a composite material. To address this need, we propose application of a “Modular UV Patch” (MUVP) system that incorporates ultraviolet curing resin systems and an innovative technique for delivering the UV light through optically leaky fibers that f ...

    SBIR Phase II 2009 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government