You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH RESOLUTION ACOUSTO-OPTIC DEVICES FOR OPTICAL SIGNAL PROCESSING
SBC: BRIMROSE CORPORATION OF AMERICA Topic: N/AN/A
SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency -
PROCESS AND PHYSICS-BASED MESFET MODELS
SBC: Compact Software, Inc. Topic: N/ACOMPACT SOFTWARE PROPOSES TO DEVELOP PHYSICS-BASED MESFET, HEMT AND HBT MODELS AND THEN INTEGRATE THEM INTO OUR COMMERCIAL MICROWAVE NONLINEAR CIRCUIT SIMULATOR, "MICROWAVE HARMONICA." EXISTING EXTRACTION BASED MODELS SUCH AS THE MODIFIED MATERKA AND CURTICE MODELS ARE BASED ON MICROWAVE MEASUREMENT INFORMATION. THE USE OF PHYSICS OR PROCESS-BASED MODELS COMPLETES THE ANALYSIS CHAIN BY LINKINGPROC ...
SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency -
EVALUATION OF THERMAL CONTROL CONCEPTS FOR SMALL SATELLITES
SBC: DYNATHERM CORP. Topic: N/ATHIS PROPOSAL IS SUBMITTED JOINTLY BY DYNATHERM AND ITS AFFILIATE THERMACORE. A STUDY IS PROPOSED THAT WILL EVALUATE SEVERAL THERMAL CONTROL CONCEPTS FOR SMALL SATELLITES WITH A NOMINAL THERMAL DISSIPATION OF 1 KW. FIVE CONCEPTS HAVE BEEN IDENTIFIED IN THE PROPOSAL: DEPLOYABLE RADIATORS, THERMAL STORAGE, HEAT PUMPS, VARIABLE CONDUCTANCE HEAT PIPES AND INTEGRATED STRUCTURAL HEAT PIPES. EACH CONCEPT ...
SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency -
DESIGN OF A ROBOTIC RESEARCH VEHICLE (RRV)
SBC: ROBOTIC SYSTEMS TECHNOLOGY Topic: N/ATHERE IS A GROWING REQUIREMENT TO REMOVE THE SOLDIER FROM THE HAZARDOUS BATTLEFIELD ENVIRONMENT AND REPLACE HIM WITH UNMANNED GROUND VEHICLES. PURE TELEOPERATION REQUIRES CONSTANT OPERATOR ATTENTION DURING "MENIAL TASKS" SUCH AS DRIVING, WHICH ELIMINATES ANY OF THE POTENTIAL FORCE MULTIPLICATION AVAILABLE WITH SINGLE OPERATOR/ MULTI-VEHICLE CONTROL. CURRENTLY DARPA IS ACTIVELY DEVELOPING THE KEY T ...
SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency