You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TIED-BACK ELEMENT & SOIL NAILING WALL

    SBC: Schnabel Foundation Company            Topic: N/A

    THIS PROPOSAL CONCERNS THE DEVELOPMENT OF AN INNOVATIVE EARTH RETENTION SYSTEM. SPECIFICALLY, IT RELATES TO COMBINING PERMANENTLY TIED-BACK ELEMENTS WITH SOIL NAILING TO ENABLE THE CONSTRUCTION OF A RETAINING WALL IN SOILS AND SOFT ROCKS. THIS EARTH RETENTION SYSTEM IS BUILT FROM THE TOP DOWN AS THE EXCAVATION PROCEEDS AND CAN BE USED FOR A PERMANENT OR TEMPORARY WALL, OR TO STABLIZE LANDSLIDES.

    SBIR Phase II 1984 Department of Transportation
US Flag An Official Website of the United States Government