You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
INTEGRATION OF EXPERT SYSTEM FOR PROCESS PLANNING AND FEATURE BASED DESIGNS
SBC: Cim Systems, Inc. Topic: N/AARTIFICIAL INTELLIGENCE/EXPERT SYSTEM TECHNIQUES HAVE DEMONSTRATED THE ABILITY TO ADDRESS COMPLEX REASONING TASKS REQUIRED FOR PROCESS PLANNING. FEATURE-BASED DESIGN THEORY AND PRELIMINARY EFFORTS HAVE SHOWN THE POTENTIAL OF PROVIDING A FUNDAMENTAL MODEL FOR CAPTURE AND MANIPULATION OF DESIGN KNOWLEDGE. HOWEVER, THE TWO TECHNOLOGIES HAVE NOT BEEN SUFFICIENTLY INTEGRATED TO ALLOW DESIGN FEATURES TO ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
COMMON INTELLIGENT TUTORING SYSTEM ARCHITECTURE APPLICATION TO A FAMILY OF WEAPON SYSTEMS
SBC: GLOBAL INFORMATION SYSTEMS TECHNOLOGY Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation -
VIRTUAL FACTORIES AS A MECHANISM FOR CONTINUOUS BUSINESS RE-ENGINEERING
SBC: KNOWLEDGE BASED SYSTEMS, INC. Topic: N/ATHE PRIMARY GOAL OF THIS PROJECT IS TO DEVELOP AND DEMONSTRATE A SIMULATION/FACTORY CONTROL CAPABILITY TO (1) SIMULATE PRODUCTS, PROCESSES, AND FACTORY CONFIGURATIONS AT MULTIPLE LEVELS OF ABSTRACTION, (2) PROVIDE FINE GRAINED ANALYSIS OF PRODUCT AND PROCESS DESIGNS, AND (3) PROVIDE A MODEL DRIVEN FACTORY CONTROL ARCHITECTURE SO THAT THE MODELS EXECUTED IN THE SIMULATION STUDIES CAN BE DIRECTLY US ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
APPLICATIONS OF FULLERENES: CATALYST SUPPORTS FOR AQUEOUS FUEL CELLS
SBC: Lynntech Inc. Topic: N/AFUEL CELLS OPERATING IN AQUEOUS ELETROLYTES (BELOW 200¿C, DEPENDING ON THE CHOSEN ELECTROLYTE TECHNOLOGY) NORMALLY OPERATE ON HYDROGEN FUEL AND OXYGEN (OR AIR) AS THE OXIDANT. HIGH-PERFORMANCE FUEL CELL ELECTRODES REQUIRE HIGH CATALYST SURFACE AREAS, GOOD ELECTRONIC CONDUCTIVITIES AND BROAD REACTION ZONES, DEFINED BY THE CONTACT AREA BETWEEN THE CATALYST, THE GAS PHASE REACTANT AND THE ELECTROLYT ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
PHOTON NUMBER AMPLIFIER FOR OPTICAL COMMUNICATIONS AND DETECTIONS
SBC: Quantum Advance Technology, Topic: N/ATHE NOVEL CONCEPT OF PHOTON NUMBER AMPLIFIER HAS BEEN RECENTLY SUGGESTED, WHICH IS QUANTUM DEVICE CAPABLE OF NOISE-FREE AMPLIFICATION OF THE INPUT SIGNAL PHOTON NUMBER. NO EXPERIMENTAL PROGRESS ON THE REALIZATION OF THIS DEVICE HAS YET BEEN REPORTED. IN PRINCIPLE, PHOTON NUMBER AMPLIFIER CAN GREATLY IMPROVE THE SENSITIVITY OF DIRECT OPTICAL DETECTION WHICH IS IMPORTANT IN MANY SCIENTIFIC AND TECHN ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION
SBC: Stress Eng Services, Inc Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
AIRCRAFT SAFTEY
SBC: SYSTEMS & ELECTRONICS, INC. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation