You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
NEWEST GENERATION SOLID STATE INERTIAL MEASUREMENT UNIT APPLICATION TO TANK AND HOWITZER-FIRED INERTIALLY GUIDED CONVENTIONAL MUNITIONS
SBC: Brown R G Associates Inc. Topic: N/AFEASIBILITY STUDY FOR APPLICATION OF MICROMECHANICAL GYRO AND ACCELEROMETER TECHNOLOGY OR OTHER SOLID STATE INERTIAL SENSORS FOR INERTIALLY GUIDED CONVENTIONAL MUNITIONS. INERTIAL MEASUREMENT UNITS (IMU'S) ARE CONCEPTUALLY DEFINED FOR USE ON THE MUNITION AND ON THE WEAPON DELIVERY PLATFORM. ESTIMATES OF IMPACT ACCURACY MADE. IMU REQUIREMENTS ARE DEFINED. INNOVATIVE DUAL IMU APPROACH APPLIED TO TAN ...
SBIR Phase II 1990 Department of DefenseDefense Advanced Research Projects Agency -
INTEGRATION OF EXPERT SYSTEM FOR PROCESS PLANNING AND FEATURE BASED DESIGNS
SBC: Cim Systems, Inc. Topic: N/AARTIFICIAL INTELLIGENCE/EXPERT SYSTEM TECHNIQUES HAVE DEMONSTRATED THE ABILITY TO ADDRESS COMPLEX REASONING TASKS REQUIRED FOR PROCESS PLANNING. FEATURE-BASED DESIGN THEORY AND PRELIMINARY EFFORTS HAVE SHOWN THE POTENTIAL OF PROVIDING A FUNDAMENTAL MODEL FOR CAPTURE AND MANIPULATION OF DESIGN KNOWLEDGE. HOWEVER, THE TWO TECHNOLOGIES HAVE NOT BEEN SUFFICIENTLY INTEGRATED TO ALLOW DESIGN FEATURES TO ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation -
VIRTUAL FACTORIES AS A MECHANISM FOR CONTINUOUS BUSINESS RE-ENGINEERING
SBC: KNOWLEDGE BASED SYSTEMS, INC. Topic: N/ATHE PRIMARY GOAL OF THIS PROJECT IS TO DEVELOP AND DEMONSTRATE A SIMULATION/FACTORY CONTROL CAPABILITY TO (1) SIMULATE PRODUCTS, PROCESSES, AND FACTORY CONFIGURATIONS AT MULTIPLE LEVELS OF ABSTRACTION, (2) PROVIDE FINE GRAINED ANALYSIS OF PRODUCT AND PROCESS DESIGNS, AND (3) PROVIDE A MODEL DRIVEN FACTORY CONTROL ARCHITECTURE SO THAT THE MODELS EXECUTED IN THE SIMULATION STUDIES CAN BE DIRECTLY US ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
RAPID PROTOTYPING OF ELECTROMECHANICAL SYSTEMS BY PRINTED INTEGRATED FABRICATION
SBC: Light Sculpting Inc Topic: N/ATHE PROJECT IS AIMED AT DEVELOPING A NEW TECHNOLOGY FOR PRINTED INTEGRATED FABRICATION OF ELECTROMECHANICAL SYSTEMS (INCLUDING MULTI-LAYER ELECTRIC CIRCUT BOARDS AS WELL AS OPTOELECTROMECHANICAL DEVICES SUCH AS AIRCRAFT/VEHICLE INSTRUMENT PANELS) AS A MONOLITHIC OBJECT USING A FAST LOW-COST AUTOMATABLE PROCESS THAT IS HIGHLY EFFICIENT FOR PROTOTYPING. THE PROCESS IS BASED ON SOLIDIFICATION OF LIQU ...
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER
SBC: LOCUS, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation -
APPLICATIONS OF FULLERENES: CATALYST SUPPORTS FOR AQUEOUS FUEL CELLS
SBC: Lynntech Inc. Topic: N/AFUEL CELLS OPERATING IN AQUEOUS ELETROLYTES (BELOW 200¿C, DEPENDING ON THE CHOSEN ELECTROLYTE TECHNOLOGY) NORMALLY OPERATE ON HYDROGEN FUEL AND OXYGEN (OR AIR) AS THE OXIDANT. HIGH-PERFORMANCE FUEL CELL ELECTRODES REQUIRE HIGH CATALYST SURFACE AREAS, GOOD ELECTRONIC CONDUCTIVITIES AND BROAD REACTION ZONES, DEFINED BY THE CONTACT AREA BETWEEN THE CATALYST, THE GAS PHASE REACTANT AND THE ELECTROLYT ...
SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency -
A BATTLEFIELD SEISMIC NETWORK SYSTEM
SBC: North American Geotechnical Company Topic: N/AALGORITHMS ARE DERIVED THAT DEFINE THE PATHS OF MAXIMUM COHERENCY FOR A SEISMIC EVENT GENERATED BY FIRING AN ARTILLERY WEAPON FROM AN ARBITRARY LOCATION. SIGNAL EXTRACTION TECHNIQUES ARE DESCRIBED TO EXTRACT THE COHERENT SIGNAL FROM AN EVENT RECORDED ON MULTIPLE RECEIVERS. SIMULATED BATTLEFIELD RECORDINGS ARE GENERATED BY TREATING THE SEISMIC SIGNATURE OF ARTILLERY WEAPONS AS IMPULSE RESPONSES FRO ...
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation