You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Decision Support Tools for State of Good Repair
SBC: TWILIGHT TRAINING, L.L.C. Topic: 131FT2Every asset ages. Pipes, roads, computers, cars, etc. This fact is inevitable. And, as a result of the aging process, every asset suffers a degradation in its intended capability or performance over time. Yet every day, millions of people in the U.S. get up in the morning expecting that they will be able to travel to work, drink clean water, use the Internet, and so on. It usually takes a catastro ...
SBIR Phase I 2013 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION
SBC: Stress Eng Services, Inc Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
A RELIABLE LOCOMITIVE CAB ALERTER
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/ASEVERAL CONCEPTS ARE PROPOSED FOR LOCOMOTIVE CAB ALERTERS THAT CAN BE RETROFITTED TO ALERTER SYSTEMS ALREADY IN SERVICE. THE CONCEPTS INCLUDE A TOUCH SCREEN, WHICH REQUIRES TOUCHING A TARGET TO RESET THE TIMER OR TO RESPOND TO THE ALERTER LIGHT PROMPT. THE INITIAL LOCATION OF THE TARGET ON THE SCREEN IS AUTOMATICALLY SELECTED AT RANDOM. ANOTHER CONCEPT IS THE USE OF A TELEPHONE KEYPAD WITH LCD, WH ...
SBIR Phase I 1992 Department of Transportation -
A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/ATII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...
SBIR Phase I 1992 Nuclear Regulatory Commission